NEW QUESTION 198
Acme Chemical Company has a price order winner, which actions are consistent with this advantage?
- A. level production strategy,freight consolidation, and SPC
- B. combination production strategy, freight consolidation, and incoming inspection
- C. level production strategy, LTL transport, and incoming inspection
- D. chase production strategy, freight consolidation, and kaizan teams
Answer: A
NEW QUESTION 199
Providing a routine method for regularly updating item forecasts is known as:
- A. Exponential smoothing
- B. Stable trend smoothing
- C. Steady smoothing
- D. Regular smoothing
Answer: A
NEW QUESTION 200
Find methods to maximize the utilization of the constraint toward productive throughput is called:
- A. Manage constraint
- B. Utilize constraint
- C. None of the above
- D. Exploit constraint
Answer: D
NEW QUESTION 201
The planning horizon is usually longer for several reasons e.g.:
- A. All of these
- B. The longer the horizon, the better the management's ability to take advantage of special circumstances.
- C. The longer the horizon, the better management's ability to avoid future problems
- D. The longer the horizon, the greater the "visibility"
Answer: A
NEW QUESTION 202
Which one of the following statements is about capacity requirements planning?
- A. Both A&B
- B. This type of planning focuses on components parts, grater detail is involved than in roughcut capacity planning.
- C. It is directly liked to the material requirements plan
- D. Involves translating monthly, quarterly or annual product priorities from the production plan into some total measure of capacity, such as gross labor house.
Answer: A
NEW QUESTION 203
The MPS is a plan for manufacturing; it reflects the needs of the marketplace and the capacity of manufacturing and forms a priority plan for manufacturing to follows: The MPS forms a vital link between sales and production as follows:
- A. None of these
- B. Both of these
- C. It is contract between marketing and manufacturing. It is an agreed- upon plan
- D. It makes possible valid order promises. The MPS is a plan of what is to be produced and when. As such, it tells sales and manufacturing when goods will be available for delivery.
Answer: B
NEW QUESTION 204
Today production control works in a demanding environment shaped by six major challenges. Which one of the following is not of those challenges?
- A. None of these
- B. Customer that are never satisfied
- C. A supply chain that is large and must be manage
- D. A product life cycle that is getting shorter and shorter
Answer: A
NEW QUESTION 205
The information for the CRP inputs can be obtained from:
- A. All of these
- B. Routing and work center file
- C. MRP
- D. Open order fie
Answer: A
NEW QUESTION 206
_ is the delivered cost of a product to a particular geographic point.
- A. Deteriorate cost
- B. Service cost
- C. Laid-down cost
- D. Delivery cost
Answer: C
NEW QUESTION 207
What is the rule for forecasting with seasonality?
- A. All of the above
- B. Only use deseasonalized data to forecast.
- C. Forecast deseasonalized demand, not seasonal demand
- D. Calculate the seasonal forecast by applying the seasonal index to the base forecast.
Answer: A
NEW QUESTION 208
Toyota has designed seven important sources of waste in manufacturing. The first four relate to the design of the manufacturing system and the last there to the operation and management of the system. Which one of the following is NOT out of those sources of waste?
- A. Overproductions
- B. Product Defects
- C. Movement
- D. Bottlenecks
Answer: D
NEW QUESTION 209
Poke-Yoke (Fail Safe) tries to change either the process or its resources, thus eliminating the need to rely on human experience and knowledge. Examples include:
- A. None of these
- B. Both of these
- C. Put a template over an assembled component to show operators where specific parts go
- D. Use color-coded parts
Answer: B
NEW QUESTION 210
Metrics give us:
- A. Product description
- B. Process specification
- C. Control by supervisors
- D. Reporting of data to supers and external description
Answer: C,D
NEW QUESTION 211
It provides a yard stick for measuring work content and unit for stating capacity. What is it?
- A. Lead time
- B. Standard time
- C. Move time
- D. Work effort
Answer: B
NEW QUESTION 212
FLY Manufacturing is an aircraft manufacturer. They produce executive jets on an Engineer-to-order basis. Which of the following MRPII processes would most likely NOT be required at FLY?
- A. materials requirements planning
- B. Business Planning
- C. Distribution Requirements Planning
- D. Sales & operations Planning
Answer: C
NEW QUESTION 213
When the last operation is on the routing is scheduled first and is scheduled for complete at the due date, this is called:
- A. Timid scheduling
- B. Self-assistant scheduling
- C. Rearward scheduling
- D. Backward scheduling
Answer: D
NEW QUESTION 214
The material requirement plan authorizes production activity control (PAC):
- A. To manage day-to-day activity and provide the necessary support
- B. All of these
- C. To work orders to the shop for manufacturing
- D. To take control of work orders and make sure they are completed on time
Answer: B
NEW QUESTION 215
XYZ Company is pursuing improved quality levels. Which of the following actions would produce the best results for XYZ?
- A. reduce process variability
- B. Hire additional inspectors
- C. tighten tolerances
- D. adopt a quality first slogan
Answer: A
NEW QUESTION 216
Inventory Record is one of the major input to the
- A. Material Requirements planning (MRP) System
- B. Production activity Control
- C. Capacity Requirements planning (CRP)
- D. Manufacturing Planning and Control (MPC) Function
Answer: A
NEW QUESTION 217
Order quantity is 1000 units and safety stock is 300 units. What is the average inventory?
- A. 980 units
- B. 900 units
- C. 890 units
- D. 800 units
Answer: D
NEW QUESTION 218
The carrying cost is usually defined as a percentage of the dollar value of inventory per unit of time.
- A. False
- B. True
Answer: B