NEW QUESTION 262
Materials should be moved from point of manufacture to point of use when:

  • A. production is completed at point of manufacture
  • B. material at point of use is zero
  • C. material handling equipment is available
  • D. the materials are needed at point of use

Answer: D

 

NEW QUESTION 263
1. Determine the standard hours of operation time for each planned and released order for each work center by time period.
2. Add all the standard hours together for each work center in each period. These are the steps of calculating:

  • A. None of these
  • B. Capacity required
  • C. Available capacity
  • D. load

Answer: B,D

 

NEW QUESTION 264
What may vary depending upon the interest rates, the credit rating of the firm, and the opportunities the firm may have for investment?

  • A. Inventory cost
  • B. Item cost
  • C. Normal cost
  • D. Capital cost

Answer: D

 

NEW QUESTION 265
Pareto analysis can be used:

  • A. to identify process bottleneck
  • B. to select problems with the greatest economic impact
  • C. To manage excessive overtime
  • D. To locate employee grievances with true assignable causes

Answer: B

 

NEW QUESTION 266
It takes capacity planning to the next level of detail .The master production schedule is the primary information source. What is it?

  • A. None of these
  • B. Resource planning
  • C. Capacity requirement planning
  • D. Rough-out capacity planning

Answer: D

 

NEW QUESTION 267
The elimination of all waste and continuous improvement of productivity is known as:

  • A. Just-in-time manufacturing
  • B. Up-gradation manufacturing
  • C. All of the above
  • D. Work-in-progress manufacturing

Answer: A

 

NEW QUESTION 268
The planning horizon is usually longer for several reasons e.g.:

  • A. All of these
  • B. The longer the horizon, the better management's ability to avoid future problems
  • C. The longer the horizon, the better the management's ability to take advantage of special circumstances.
  • D. The longer the horizon, the greater the "visibility"

Answer: A

 

NEW QUESTION 269
Physical distribution contributes to:

  • A. Prompt delivery
  • B. All of these
  • C. Product availability and accurate order filling
  • D. Creating demand

Answer: B

 

NEW QUESTION 270
A routing file should exist for every component manufactured and contain which of the following information?

  • A. Work centers to be used
  • B. Standard times
  • C. All of the above
  • D. Tooling needed at each operation

Answer: C

 

NEW QUESTION 271
As used in material management, bill of material:

  • A. Both of these
  • B. None of these
  • C. Describes the components used to make the product
  • D. Describes the subassemblies at various stages of manufacture.

Answer: A

 

NEW QUESTION 272
What consist of a series of operations required to make the item?

  • A. builds
  • B. routing
  • C. All of the above
  • D. procedures

Answer: B

 

NEW QUESTION 273
The CPI system is based on the scientific methods. This general method is used to solve many kinds of problems. Which of the following is NOT the out of six steps continuous improvement process?

  • A. Analyze the recorded data to generate alternatives improved methods
  • B. Select the process to be studied
  • C. Record the existing method to collect the necessary data in a useful form
  • D. Bottlenecks

Answer: D

 

NEW QUESTION 274
An attempt to provide more satisfying meaningful jobs and to use the worker's mental and interpersonal skills is called:

  • A. Job design
  • B. Job accomplishment
  • C. Job assignment
  • D. Job enrichment

Answer: A

 

NEW QUESTION 275
_ is the delivered cost of a product to a particular geographic point.

  • A. Deteriorate cost
  • B. Laid-down cost
  • C. Delivery cost
  • D. Service cost

Answer: B

 

NEW QUESTION 276
A bill is used when companies usually make more than one product and the same components are often used in several products

  • A. Indented bill
  • B. Single-level bill
  • C. Multiple bill
  • D. Multilevel bill

Answer: C

 

NEW QUESTION 277
Operation number
Setup hours, planned and actual
Quantity reported complete at the operation
Quantity reported scrapped at that operation
Due date or lead time remaining
These are the components of related to each operation.

  • A. Shop order master file
  • B. None of these
  • C. Shop-order detail file
  • D. Work-center master file

Answer: C

 

NEW QUESTION 278
The purpose
change.

  • A. Change management plan
  • B. Strategic business plan
  • C. Production plan
  • D. Scheduling plan

Answer: B

 

NEW QUESTION 279
An income statement of a company is as follows:

If through a well-organized materials management department direct materials can be reduced by 10% and direct labor by 5% the improvements in profits would be:

  • A. 5%
  • B. 6%
  • C. 4%
  • D. 7%

Answer: B

 

NEW QUESTION 280
A full load costs more per ton to ship than a part load

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 281
......