NEW QUESTION # 81
Planning file/s needed for the production activity control is/are:

  • A. Routing and work center master file.
  • B. All of these
  • C. Product structure file
  • D. Item master file

Answer: B


NEW QUESTION # 82
Price competition is often severe and profits start to decline, in which phase of the life cycle of a product?

  • A. Decline phase
  • B. Growth phase
  • C. Maturity phase
  • D. Introduction phase

Answer: C


NEW QUESTION # 83
Demonstrated capacity is average, not maximum, output and depends on the utilization and efficiency of work center.

  • A. True
  • B. False

Answer: A


NEW QUESTION # 84
is responsible for producing a set of specifications that manufacturing can use to make the product. Products must be designed to be:
* Functional
* Capable of low-cost processing

  • A. All of these
  • B. Production Plan
  • C. Marketing mix
  • D. Product Design

Answer: D


NEW QUESTION # 85
Which one of the following tools that cannot be used to evaluate feasibility of a strategy?

  • A. Resource deployment analysis
  • B. Cash flow analysis and forecasting
  • C. Break-Even analysis
  • D. None of these

Answer: D


NEW QUESTION # 86
When the quantity of an item on hand in inventory falls to a predetermined level called:

  • A. None of the above
  • B. Order point
  • C. Demand point
  • D. Lead level

Answer: B


NEW QUESTION # 87
End-of-line inspection often fails to improve quality for which of the following reasons?

  • A. It lacks source accountability.
  • B. It requires extensive personnel.
  • C. Its costs are significant
  • D. It excludes quality circles.

Answer: A


NEW QUESTION # 88
Planning bills are used to:

  • A. All of the above
  • B. Material requirements planning
  • C. Master production scheduling
  • D. Simplify forecasting

Answer: A


NEW QUESTION # 89
What is responsible for executing the master production schedule and the material requirements plan?

  • A. Master production plan
  • B. Production activity control
  • C. Production requirement plan
  • D. Standard production

Answer: B


NEW QUESTION # 90
What will be the impact on inventory turns if average inventory levels are cut in half and all other operating conditions remain the same?

  • A. Turns will remain constant
  • B. Turns will increase by the square root of 2
  • C. Turns will double
  • D. Turns will be cut in half

Answer: C


NEW QUESTION # 91
is difference between the total planned for a given period and the
actual total for that period.

  • A. Collective concern
  • B. Total control rate
  • C. Cumulative variance
  • D. Increasing rate

Answer: C


NEW QUESTION # 92
A convenient way to think about bills of material is through:

  • A. All of the above
  • B. Product Tree
  • C. Dependent demand
  • D. Inventory record

Answer: B


NEW QUESTION # 93
to the marketplace depends on being able to provide shorter lead times and better due date performance.

  • A. Reliability
  • B. Equivalence
  • C. Responsiveness
  • D. Productivity

Answer: C


NEW QUESTION # 94
A company ships a particular product to a market located 1000 miles from the plant at a cost of $4 per mile. Normally it ships 500 units at a time. If the company can ship the units unassembled, it can ship 800 units in a truck. What is the line-haul cost per unit now?

  • A. $4
  • B. $10
  • C. $5
  • D. $8

Answer: C


NEW QUESTION # 95
Production activity control activities in manufacturing planning and control may also be called:

  • A. Master planning
  • B. Shop-floor control
  • C. Capacity planning
  • D. Material Requirement planning

Answer: B


NEW QUESTION # 96
is a usual process to start with the due date and using find lead time, to work back to operations?

  • A. Utilization
  • B. Efficiency
  • C. Capacity management
  • D. Back Scheduling

Answer: D


NEW QUESTION # 97
......