NEW QUESTION # 81
Planning file/s needed for the production activity control is/are:
- A. Routing and work center master file.
- B. All of these
- C. Product structure file
- D. Item master file
Answer: B
NEW QUESTION # 82
Price competition is often severe and profits start to decline, in which phase of the life cycle of a product?
- A. Decline phase
- B. Growth phase
- C. Maturity phase
- D. Introduction phase
Answer: C
NEW QUESTION # 83
Demonstrated capacity is average, not maximum, output and depends on the utilization and efficiency of work center.
- A. True
- B. False
Answer: A
NEW QUESTION # 84
is responsible for producing a set of specifications that manufacturing can use to make the product. Products must be designed to be:
* Functional
* Capable of low-cost processing
- A. All of these
- B. Production Plan
- C. Marketing mix
- D. Product Design
Answer: D
NEW QUESTION # 85
Which one of the following tools that cannot be used to evaluate feasibility of a strategy?
- A. Resource deployment analysis
- B. Cash flow analysis and forecasting
- C. Break-Even analysis
- D. None of these
Answer: D
NEW QUESTION # 86
When the quantity of an item on hand in inventory falls to a predetermined level called:
- A. None of the above
- B. Order point
- C. Demand point
- D. Lead level
Answer: B
NEW QUESTION # 87
End-of-line inspection often fails to improve quality for which of the following reasons?
- A. It lacks source accountability.
- B. It requires extensive personnel.
- C. Its costs are significant
- D. It excludes quality circles.
Answer: A
NEW QUESTION # 88
Planning bills are used to:
- A. All of the above
- B. Material requirements planning
- C. Master production scheduling
- D. Simplify forecasting
Answer: A
NEW QUESTION # 89
What is responsible for executing the master production schedule and the material requirements plan?
- A. Master production plan
- B. Production activity control
- C. Production requirement plan
- D. Standard production
Answer: B
NEW QUESTION # 90
What will be the impact on inventory turns if average inventory levels are cut in half and all other operating conditions remain the same?
- A. Turns will remain constant
- B. Turns will increase by the square root of 2
- C. Turns will double
- D. Turns will be cut in half
Answer: C
NEW QUESTION # 91
is difference between the total planned for a given period and the
actual total for that period.
- A. Collective concern
- B. Total control rate
- C. Cumulative variance
- D. Increasing rate
Answer: C
NEW QUESTION # 92
A convenient way to think about bills of material is through:
- A. All of the above
- B. Product Tree
- C. Dependent demand
- D. Inventory record
Answer: B
NEW QUESTION # 93
to the marketplace depends on being able to provide shorter lead times and better due date performance.
- A. Reliability
- B. Equivalence
- C. Responsiveness
- D. Productivity
Answer: C
NEW QUESTION # 94
A company ships a particular product to a market located 1000 miles from the plant at a cost of $4 per mile. Normally it ships 500 units at a time. If the company can ship the units unassembled, it can ship 800 units in a truck. What is the line-haul cost per unit now?
- A. $4
- B. $10
- C. $5
- D. $8
Answer: C
NEW QUESTION # 95
Production activity control activities in manufacturing planning and control may also be called:
- A. Master planning
- B. Shop-floor control
- C. Capacity planning
- D. Material Requirement planning
Answer: B
NEW QUESTION # 96
is a usual process to start with the due date and using find lead time, to work back to operations?
- A. Utilization
- B. Efficiency
- C. Capacity management
- D. Back Scheduling
Answer: D