SAP PP Certification Exam Details:
| Reference Books | SCM240,SCM310, SCM300, SCM130, PLM114, TERP50, TERP01,SCM365 |
| Sample Questions | SAP PP Certification Sample Questions |
| Exam Name | SAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Number of Questions | 80 |
| Passing Score | C_TSCM42_67 - 63% |
| Duration | 180 mins |
| Level | Associate |
| Exam Code | C_TSCM42_67 |
| Exam Price | $550 (USD) |
| Schedule Exam | SAP Training |
SAP C_TSCM42_67 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Lean Manufacturing (PP-REM, PP-KAB) 8% - 12% | Outline the highlights of repetitive manufacturing and kanban. |
| Production Orders Basics (PP-SFC) 8% - 12% | Apply production order functionality. |
| Application Overview and Background < 8% | Characterize the interplay of master data, planning, ATP, and production functionality. |
| Master Data (LDM) 8% - 12% | Set up master data for production planning and manufacturing. |
| Process Orders (PP-PI) < 8% | Identify specific properties of process orders. |
| Basics on SAP Business Processes (E-Learnings) < 8% | Outline the scope of SAP SCM business processes. |
| Production Orders Advanced (PP-SFC) > 12% | Configure production order functionality. |
| Material and Capacity Requirements Planning > 12% | Characterize production-relevant planning functionality. |
| Material Requirements Planning (PP-MRP) > 12% | Explore material requirements planning functions. |
NEW QUESTION 63
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:
Exhibit
- A. The selection method is set to "selection only by production version" in the material master.
- B. A valid routing exists, but the material master is set to manual routing selection.
- C. A valid routing exists, but the Customizing for the order type is set to manual routing selection.
- D. The routing is not valid at the explosion date.
Answer: D
NEW QUESTION 64
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
- A. The MRP elements are linked via fixed pegging.
- B. Requirements planning has not been carried out.
- C. The delta between the availability dates falls within the tolerance window defined in Customizing.
- D. The fixed planned order is outside the rescheduling horizon.
Answer: C,D
NEW QUESTION 65
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- A. Lead time scheduling cannot take place.
- B. Requirements planning creates an appropriate exception message in basic dates scheduling.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
Answer: D
NEW QUESTION 66
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?
- A. An ATP check creates fixed links between customer orders and their confirmed receipts.
- B. The ATP quantity is the available quantity that can be used to confirm incoming customer orders.
- C. If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible.
- D. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.
Answer: B
NEW QUESTION 67
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)
- A. Production Scheduling Profile
- B. Material Master (Finished Product)
- C. Routing
- D. Material Master (Component)
- E. Work Center
Answer: C,D,E
NEW QUESTION 68
What are characteristics of repetitive manufacturing? (Choose three)
- A. Production without using production orders and without status management
- B. Continuous material consumption, production flow and output
- C. Shop fabrication
- D. Automatic line loading based on capacity limits across all production lines
- E. Period-based planning of the quantities to be produced
Answer: A,B,E
NEW QUESTION 69
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?
- A. Plant data collection (PP-PDC) interface
- B. SAP Business Intelligence (BI)
- C. Execution Steps (XSteps) and process messages
- D. SAP Application Link Enabling (ALE)
Answer: C
NEW QUESTION 70
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
- A. Activate the availability check and assign an overall profile in the production scheduling profile.
- B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
- C. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
- D. Assign an appropriate availability checking rule to the material master for the product.
Answer: C
NEW QUESTION 71
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)
- A. Standard values in the operations of routings
- B. General operation values of routings
- C. User-defined fields in the operation of routings
- D. General item values of bill of materials
- E. General values from work scheduling view of the material master
Answer: A,B,C
NEW QUESTION 72
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
- A. It is predefined in Customizing.
- B. By the planning time fence from the material master
- C. By the manual firming date
- D. By the firming mechanism with the longer firming interval
Answer: D
NEW QUESTION 73
Which of the following organizational efforts can be minimized using the KANBAN procedure?
- A. Effort for master data maintenance
- B. Effort for material staging
- C. Effort for capacity planning
- D. Effort for Sales and Operations Planning (SOP)
Answer: B
NEW QUESTION 74
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)
- A. Logistics Information System (LIS)
- B. Pick list
- C. Material directory
- D. Pull list
- E. Automatic generation of a transport order
Answer: B,D,E
NEW QUESTION 75
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default.
However, some materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?
- A. Set the planning horizon in the MRP groups and assign deviant entries via the plant parameter settings in Customizing.
- B. Set the planning horizon in the plant parameters in Customizing and assign deviant entries via the MRP groups for the corresponding materials.
- C. Set the planning horizon in the plant parameters in Customizing and store deviant entries in the material masters for corresponding materials.
- D. Set the planning horizon in the MRP groups in Customizing and store deviant entries in the material masters for the corresponding materials.
Answer: B
NEW QUESTION 76
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?
- A. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
- B. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
- C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
- D. In multi-level backward scheduling, dependent requirements are calculated to the exact second.
Answer: C
NEW QUESTION 77
Where can you define the default storage location for the material component of a production order? (Choose three)
- A. Production version (product)
- B. Routing
- C. BOM header (product)
- D. Production supply area of a work center
- E. Material master (component)
Answer: A,D,E
NEW QUESTION 78
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
- A. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
- B. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
- C. A planning algorithm from capacity planning
- D. Manual assignment of planned production quantities in a planning table
- E. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
Answer: A,B,D
NEW QUESTION 79
Which of the following master data can be used with process orders? (Choose three)
- A. Production/resource tools
- B. Production versions
- C. Resources
- D. Serial numbers
- E. Master recipes
Answer: B,C,E
NEW QUESTION 80
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.)
- A. In case of external procurement, long-term planning creates purchase requisitions.
- B. A planning scenario must be released to use it in long-term planning.
- C. Long-term planning generally is operational planning of important components.
- D. Reorder point planned materials can be included in long-term planning.
Answer: B,D
NEW QUESTION 81
What is SAP Solution Manager?
- A. A standalone system that communicates with other systems in a system landscape
- B. An add-on industry solution
- C. A managed system in a system landscape
- D. A transaction in the SAP ECC system
Answer: A
NEW QUESTION 82
You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly Which standard SAP material type do you use?
- A. NLAG (non-stock material)
- B. HAWA (trading good)
- C. FERT (finished product)
- D. ROH (raw material)
Answer: D
NEW QUESTION 83
Which of the following requirements is supported by using process orders?
- A. Linkage of documents to orders
- B. Documentation of the production using an electronic batch record
- C. Use of production/resource tools
- D. Use of reference operation sets
Answer: B
NEW QUESTION 84
What do you have to consider regarding lot size procedures?
- A. If a long-term lot size is used, procurement is conducted with a long-term perspective.
- B. The procurement quantity of a lot size procedure can be specified using a safety time period profile.
- C. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
- D. The lot size quantity can be influenced using a minimum lot size and the rounding profile.
Answer: D
NEW QUESTION 85
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- A. Reducing the order quantity
- B. Confirming the operation
- C. Setting the status technically complete (TECO)
- D. Rescheduling the operation
- E. Posting the goods receipt for the production order
Answer: A,B,C
NEW QUESTION 86
The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
- A. Planning with make-to-stock (strategy 10)
- B. Planning at the assembly level (strategy 70)
- C. Planning with final assembly (strategy 40)
- D. Planning without final assembly (strategy 50)
Answer: D
NEW QUESTION 87
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
- A. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
- B. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
- C. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
- D. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.
Answer: A
NEW QUESTION 88
......