Welcome to TestSimulate

Pass Your Next Certification Exam Fast!

Everything you need to prepare, learn & pass your certification exam easily.

365 days free updates. First attempt guaranteed success.

SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 (C_TSCM42_67) Free Practice Test

Question 1
What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three)

Correct Answer: B,D,E
Question 2
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?

Correct Answer: B
Question 3
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?

Correct Answer: A
Question 4
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)

Correct Answer: A,C
Question 5
Which of the following master data can be used with process orders? (Choose three)

Correct Answer: A,B,C
Question 6
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
- Start: 7:00:00 a.m.
- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1
How large is the standard available capacity?

Correct Answer: A