Get instant access to CTS-I Practice Tests 2025 Free Updated Today!
Welcome to download the newest PassLeader CTS-I PDF dumps ( 205 Q&As)
AVIXA CTS-I - Installation Exam Syllabus Topics:
| Topic | Weight |
|---|---|
| Duty A: Conducting Pre-Installation Activities | 20% |
| Task 1: Review Audiovisual Project Documentation | 4% |
| Task 2: Conduct Technical Site Survey | 4% |
| Task 3: Prepare for Audiovisual Installation | 4% |
| Task 4: Evaluate Overall Facility Readiness | 4% |
| Task 5: Conduct On-Site Preparations for Installation | 4% |
| Duty B: Conducting Site Rough-In/First-Fix | 10% |
| Task 1: Deinstallation of Existing Equipment and cabling | 2% |
| Task 2: Mount Substructure | 4% |
| Task 3: Pull Cable | 4% |
| Duty C: Installing Audiovisual Systems | 38% |
| Task 1: Assemble AV Rack | 4% |
| Task 2: Wire the AV Equipment Rack | 5% |
| Task 3: Distribute AV Equipment | 4% |
| Task 4: Mount AV Equipment | 4% |
| Task 5: Terminate Cables | 5% |
| Task 6: Configure Network Properties of Equipment | 4% |
| Task 7: Load Configuration and Control Programs | 4% |
| Task 8: Test the AV System | 4% |
| Task 9: Calibrate the AV System | 4% |
| Duty D: Perform Systems Close Out | 11% |
| Task 1: Demonstrate to Client or Client's Representative that System Performs to Specifications | 4% |
| Task 2:Provide Training on System Operation | 4% |
| Task 3:Obtain Project Completion Sign Off from Client or Client's Representative | 3% |
AVIXA CTS-I Exam Certification Details:
| Duration | 150 mins |
| Sample Questions | AVIXA CTS-I Sample Questions |
| Books / Training | Candidate Handbook |
| MemberExam Price | $475(USD) |
| Schedule Exam | Pearson VUE |
| Number of Questions | 110 |
| Non-Member Exam Price | $575(USD) |
| Exam Code | CTS-I |
| Passing Score | 350 / 500 |
NEW QUESTION # 41
A projector weighing 429 pounds (195 kilograms) should be mounted only to what type of surface?
Response:
- A. Building structural support or blocking
- B. Front wall in a classroom
- C. Ceiling tile of an auditorium
- D. Drywall in conference room
Answer: A
NEW QUESTION # 42
What should you be aware of when installing an electric front-projection screen?
Select all that apply.
Response:
- A. In a return-air plenum ceiling, local codes apply.
- B. Manufacturer's specification for setting physical switches.
- C. Keeping it horizontal when stored or transported.
- D. Some motorized screens have a motor inside the housing.
Answer: A,B,C,D
NEW QUESTION # 43
Which of the following provides a method of ensuring best image quality between source and sink/display?
Response:
- A. Hot plug
- B. EDID
- C. HDMI
- D. HDCP
Answer: B
NEW QUESTION # 44
When pulling cable in a commercial building, what is a major concern?
Response:
- A. How efficiently the cable can be pulled
- B. Using cable that is approved/rated
- C. Value of cable being installed
- D. The friction coefficient of the cable lubricant
Answer: B
NEW QUESTION # 45
The published design weight of a speaker array with mounting hardware totals 212 pounds (96 kilograms). What minimum weight should the substructure and mounting assembly be able to support?
Response:
- A. 500 pounds (227 kilograms)
- B. 2,120 pounds (962 kilograms)
- C. 424 pounds (192 kilograms)
- D. 1,060 pounds (480 kilograms)
Answer: D
NEW QUESTION # 46
Which diagram is used for positioning mounted equipment within a rack?
Response:
- A. A rack building diagram
- B. A rack mounting diagram
- C. A rack system diagram
- D. A rack elevation diagram
Answer: D
NEW QUESTION # 47
Which of the following are HDCP authentication steps?
Select all that apply.
Response:
- A. Audio and video sync check
- B. Session exchange
- C. Locality check
- D. Key exchange
Answer: B,C,D
NEW QUESTION # 48
After adjusting system equalization using the best tools available, you should ____.
Select all that apply.
Response:
- A. check the system by listening to familiar audio content
- B. change equalization off-axis to fix coverage problems
- C. check the system for distortion by listening at the highest expected volume
- D. balance amp and EQ levels by ear for best tonality
Answer: A,C,D
NEW QUESTION # 49
The picture shows a(n) _____ connector.
Response:
- A. SDI
- B. DVI
- C. HDMI
- D. HDBaseT
Answer: B
NEW QUESTION # 50
The key elements of a project should be driven by:
Response:
- A. The overall budget
- B. The client's need
- C. The deadline for completion
- D. The cost of materials
Answer: B
NEW QUESTION # 51
When pulling a group of cables through conduit, it is advisable to:
Response:
- A. Utilize a sling
- B. Make a bulkhead
- C. Use the AV pulley system
- D. Tape them together
Answer: D
NEW QUESTION # 52
What type of connector is shown in the following image?
Response:
- A. XLR
- B. BNC
- C. VGA
- D. RCA
Answer: A
NEW QUESTION # 53
When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be able to support a minimum weight of:
[Conducting Site Rough-In/First-Fix/Mount Substructure]
Response:
- A. 122kg (270lb)
- B. 82kg (180lb)
- C. 204kg (450lb)
- D. 41kg (90lb)
Answer: D
NEW QUESTION # 54
During a Technical Site Survey, for an installation with a display, information gathered should include:
[Conducting Pre-installation Activities/Evaluate Overall Facility Conditions] Response:
- A. Ceiling height and construction method
- B. Receptionist name and phone number
- C. Rules governing use of the freight elevator
- D. Color of the walls
Answer: A
NEW QUESTION # 55
When mounting a 75 lb (34 kg) projector with a 15 lb (7 kg) mount, the substructure should be able to support a minimum weight of:
[Conducting Site Rough-In/First-Fix/Mount Substructure]
Response:
- A. 270 lbs (122 kg)
- B. 90 lbs (41 kg)
- C. 450 lbs (204 kg)
- D. 180 lbs (82 kg)
Answer: C
NEW QUESTION # 56
When working as a subcontractor to the electrical contractor who do you submit change orders to?
Response:
- A. The general contractor
- B. The project manager
- C. The architect
- D. The owner
Answer: B
NEW QUESTION # 57
Which loudspeaker system is represented in the following picture? The loudspeakers are shown as circles.
Response:
- A. Distributed system
- B. Center cluster system
- C. Point source system
- D. Portable system
Answer: A
NEW QUESTION # 58
Which test verifies that a cable can transmit a signal from one end to another?
Response:
- A. Polarity test
- B. Impedance test
- C. Continuity test
- D. Signal sweep test
Answer: C
NEW QUESTION # 59
A customer has recently changed their phone system from a traditional POTS line to a VoIP-based switch. The new VoIP switch still dials out properly but no longer hangs up when the far end disconnects. What is the MOST likely problem?
Response:
- A. The phone line is now VOIP and cannot be used with an analog hybrid
- B. The on-hook voltage is too high and the hybrid is set to "loop drop"
- C. The on-hook voltage is correct and the hybrid is set to both "loop drop & call progress"
- D. The on-hook voltage is correct and the hybrid is set to "call progress"
Answer: B
NEW QUESTION # 60
When powering a system on, which device should you turn on last?
Response:
- A. Power amplifiers
- B. Pre-amplifiers
- C. Wireless mic receivers
- D. Blu-ray players
Answer: A
NEW QUESTION # 61
When mounting equipment to a concrete substructure, which fastener is the most likely to be used?
Response:
- A. Molly Bolt/hollow wall anchor
- B. Self tapping screw
- C. Toggle Bolt/Spring Toggle
- D. Drop in Anchor
Answer: D
NEW QUESTION # 62
What is industry best practice for ensuring that all equipment has been delivered to the site for an AV event?
Response:
- A. All equipment should be tagged
- B. Selected equipment is matched to the shipping manifest
- C. One person should oversee everything
- D. All delivery personnel should be assigned a color coded area
Answer: B
NEW QUESTION # 63
......