Welcome to TestSimulate

Pass Your Next Certification Exam Fast!

Everything you need to prepare, learn & pass your certification exam easily.

365 days free updates. First attempt guaranteed success.

Verified E_S4HCON2022 Q&As - Pass Guarantee E_S4HCON2022 Exam Dumps [Q13-Q34]

Share

Verified E_S4HCON2022 Q&As - Pass Guarantee E_S4HCON2022 Exam Dumps

Check the Free demo of our E_S4HCON2022 Exam Dumps with 75 Questions

NEW QUESTION # 13
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Perform an SAP S/4HANA conversion including DMO.
  • B. Use DMO for SUM.
  • C. Apply SAP Support Packages.
  • D. Upgrade the SAP system.
  • E. Apply an Enhancement Package.

Answer: C,D,E


NEW QUESTION # 14
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Apply the corresponding SAP note via SAP Note Assistant
  • B. Download it from SAP Support Portal
  • C. Generate it by analyzing the specific custom code via RFC
  • D. Configure it within transaction ATC

Answer: B


NEW QUESTION # 15
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The target database size increases temporarily because of the Shadow Repository.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • D. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: C,D


NEW QUESTION # 16
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the most recent entries in SAPup.log
  • B. Check the system log (transaction SM21) of the SAP system
  • C. Check the most recent entries shown in file sapevt.trc
  • D. Check the messages shown by the SUM UI

Answer: A,D


NEW QUESTION # 17
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. During the SUM technical downtime
  • B. During the Execution roadmap step
  • C. After SUM has ended
  • D. Before the start of the SUM technical downtime

Answer: A


NEW QUESTION # 18
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • B. ParaUel distribution (PARDIST_SHD)
  • C. Shadow repository creation (EU_IMPORT*)
  • D. Uptime migration (EU_CLONE_MIG_UT_RUN)

Answer: D


NEW QUESTION # 19
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. You need to build up a SI check framework by applying SAP notes.
  • B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • C. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

Answer: A,C


NEW QUESTION # 20
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished

Answer: A


NEW QUESTION # 21
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path is taken from the URL entered in the browser to start SUM
  • B. The path was stored in file host_profile during registration
  • C. The path was stored to the environment of user <sid>adm during registration
  • D. The path was stored in file sumabap conf during registration

Answer: D


NEW QUESTION # 22
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The target database size increases temporarily because of the Shadow Repository.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • D. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: C,D


NEW QUESTION # 23
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During downtime
  • B. Post-downtime
  • C. During SPDD
  • D. During uptime

Answer: B,D


NEW QUESTION # 24
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Switch to new repository (EU_SWITCH)
  • B. Activation of dictionary objects (ACT_UPG)
  • C. Modification adjustment (SPDD)
  • D. Conversion of application tables (PARCONVJJPG)

Answer: B,C


NEW QUESTION # 25
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Perform an SAP S/4 HANA conversion including DMO
  • B. Upgrade the SAP system
  • C. Perform an SAP S/4 HANA conversion without DMO
  • D. Apply SAP support packages
  • E. Use DMO for SUM

Answer: B,D,E


NEW QUESTION # 26
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phases EU_IMPORT*
  • B. Phase RUN_RSPTBFIL _ISUTABU
  • C. Phase DOWNCONF_DTTRANS
  • D. Phases DIFF*
  • E. Phase RUN_RSDBSCPY

Answer: A,C,D


NEW QUESTION # 27
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

  • A. Execution of eCATTs for business validation tests
  • B. Creation of the table structures in the new SAP HANA database
  • C. Execution of XPRAs and AIMs
  • D. Execution of SPDD modification adjustment
  • E. Execution of SPAU modification adjustment

Answer: A,C,E


NEW QUESTION # 28
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It contains a troubleshooting section
  • B. It is a database-specific document
  • C. It is target release specific
  • D. It contains a section "free space requirements"

Answer: C,D


NEW QUESTION # 29
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Delete client 066 (Early Watch Client)
  • B. Uninstall Fiori apps not released for SAP_UI 7.50
  • C. Uninstall industry extensions not supported by SAP S/4HANA
  • D. Install add-on SAP Gateway 7.50

Answer: A,B


NEW QUESTION # 30
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • B. Check for running R31oad processes on the host of the primary application server
  • C. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • D. Check for running R3trans processes on the host of the primary application server

Answer: C,D


NEW QUESTION # 31
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Single System" in case of an upgrade.
  • B. Using the main configuration option "Standard" when applying SAP Support Packages
  • C. Using the main configuration option "Single System" when installing an Add-On
  • D. Using the database migration option (DMO) for SUM

Answer: C


NEW QUESTION # 32
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

  • A. The SI checks are executed in the development system and the results are transported into the subsequent systems
  • B. You need to build up an SI check framework by applying SAP Notes
  • C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
  • D. The errors from the SI checks must be solved, otherwise. SUM will report an error

Answer: B,C


NEW QUESTION # 33
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

  • A. When upgrading an SAP ECC system with DMO
  • B. When performing an SAP S/4HANA conversion with DMO
  • C. When performing an SAP S/4HANA conversion without u DMO
  • D. When upgrading an SAP S/4HANA Server system

Answer: A,D


NEW QUESTION # 34
......

Get professional help from our E_S4HCON2022 Dumps PDF: https://www.testsimulate.com/E_S4HCON2022-study-materials.html