
SAP C_TS422_2021 Certification Exam Dumps with 82 Practice Test Questions
New C_TS422_2021 Exam Dumps with High Passing Rate
SAP C_TS422_2021 is a certification exam that validates an individual's knowledge and expertise in SAP S/4HANA Production Planning and Manufacturing. C_TS422_2021 exam is designed for professionals who are responsible for implementing and configuring the production planning and manufacturing module of SAP S/4HANA. Successful completion of this certification exam demonstrates the candidate's ability to use SAP S/4HANA to optimize production processes, improve efficiency, and increase profitability.
SAP C_TS422_2021 certification exam is an ideal choice for professionals who want to enhance their career prospects in the field of SAP S/4HANA Production Planning and Manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification validates the skills and knowledge required to implement and support SAP S/4HANA Production Planning and Manufacturing solutions. It also provides a competitive edge to the certified professionals in the job market and opens up new career opportunities.
SAP C_TS422_2021 certification exam is designed for individuals who want to validate their expertise in SAP S/4HANA Production Planning and Manufacturing 2021. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification exam is intended to test the knowledge and skills required to implement, manage, and customize production processes in SAP S/4HANA. It is ideal for professionals who work in production planning, manufacturing execution, material requirements planning, and shop floor operations.
NEW QUESTION # 17
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP creates capacity requirements without checking the capacity of a work center.
- C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- D. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
Answer: B
NEW QUESTION # 18
Which item statuses can you select inside a material BOM?
- A. Sales
- B. Engineering
- C. Quality management
- D. Service
Answer: A,B
NEW QUESTION # 19
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?
- A. Model a resource inbound in the location master.
- B. Model a transportation resorce in the location master.
- C. Model a handling resource in the location master and goods receipt time in the material master.
- D. Model a seperate resource in the production data structure.
Answer: B,C
NEW QUESTION # 20
Which materials have a negative quantity in a bill of materials or in a recipe?
- A. Continuous flow materials
- B. Waste products
- C. Co-products
- D. By-products
- E. Bulk materials
Answer: A,C,D
NEW QUESTION # 21
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A. Planning mode
- B. Scheduling control
- C. Finiteness level
- D. Direction
- E. Fixed pegging
Answer: A,B,D
NEW QUESTION # 22
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Setup matrix
- B. Operation network
- C. Resource network
- D. Work center hierarchy
Answer: D
NEW QUESTION # 23
What is the purpose of a reporting point confirmation in repetitive manufacturing?
- A. To stage different components for a production line simultaneously
- B. To determine the work in progress along the production line
- C. To provide timely updates of inventory management for the staged components
- D. To reduce the total production lead time for along production line
Answer: B,C
NEW QUESTION # 24
What type of time element can be reduced by strategy settings while dispatching?
- A. Transportation time
- B. Queue time
- C. Wait time
- D. Setup time
Answer: B,C
NEW QUESTION # 25
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?
- A. Plant
- B. Material
- C. Work center
- D. Production version
Answer: B,C
NEW QUESTION # 26
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?
- A. Material staging for nex order in sequence
- B. Posting of goods receipt for the product
- C. Posting of production costs to the production cost collector
- D. Reduction of associated capacity requirements
- E. Archiving of documents for assembly scrap
Answer: B,C,D
NEW QUESTION # 27
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
- A. Use a propagation range.
- B. Use a planning group.
- C. Use a resource group.
- D. Use heuristic.
Answer: D
NEW QUESTION # 28
When do you use variant bills of materials (BOMs)?
- A. When multiple materials also have similar BOMs
- B. When a material has a configurable BOM
- C. When a material has multiple BOMs
- D. When multiple materials have multiple BOMs
Answer: D
NEW QUESTION # 29
Which chart types does the tabular planning table provide in SAP S/4HANA
- A. Order (pool) chart
- B. Work center capacities chart
- C. Capacity requirements chart
- D. Order (dispatched) chart
Answer: B,C
NEW QUESTION # 30
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?
- A. When you deliver a sales order
- B. When the MRP result are saved
- C. When you create a planned order
- D. When you create a sales order
Answer: D
NEW QUESTION # 31
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
- A. Specify a negative offset time in the strategy profile.
- B. Specify a positive planning horizon in the strategy profile.
- C. Specify a positive offset time in the strategy profile.
- D. Specify a negative lanning horizon in the strategy profile.
Answer: A
NEW QUESTION # 32
......
Get C_TS422_2021 Braindumps & C_TS422_2021 Real Exam Questions: https://www.testsimulate.com/C_TS422_2021-study-materials.html