Welcome to TestSimulate

Pass Your Next Certification Exam Fast!

Everything you need to prepare, learn & pass your certification exam easily.

365 days free updates. First attempt guaranteed success.

SAP C_TS422_2021 Certification Exam Dumps with 82 Practice Test Questions [Q17-Q32]

Share

SAP C_TS422_2021 Certification Exam Dumps with 82 Practice Test Questions

New C_TS422_2021 Exam Dumps with High Passing Rate


SAP C_TS422_2021 is a certification exam that validates an individual's knowledge and expertise in SAP S/4HANA Production Planning and Manufacturing. C_TS422_2021 exam is designed for professionals who are responsible for implementing and configuring the production planning and manufacturing module of SAP S/4HANA. Successful completion of this certification exam demonstrates the candidate's ability to use SAP S/4HANA to optimize production processes, improve efficiency, and increase profitability.


SAP C_TS422_2021 certification exam is an ideal choice for professionals who want to enhance their career prospects in the field of SAP S/4HANA Production Planning and Manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification validates the skills and knowledge required to implement and support SAP S/4HANA Production Planning and Manufacturing solutions. It also provides a competitive edge to the certified professionals in the job market and opens up new career opportunities.


SAP C_TS422_2021 certification exam is designed for individuals who want to validate their expertise in SAP S/4HANA Production Planning and Manufacturing 2021. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification exam is intended to test the knowledge and skills required to implement, manage, and customize production processes in SAP S/4HANA. It is ideal for professionals who work in production planning, manufacturing execution, material requirements planning, and shop floor operations.

 

NEW QUESTION # 17
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP creates capacity requirements without checking the capacity of a work center.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP assigns capacity requirements automatically after the last scheduled order on a work center.

Answer: B


NEW QUESTION # 18
Which item statuses can you select inside a material BOM?

  • A. Sales
  • B. Engineering
  • C. Quality management
  • D. Service

Answer: A,B


NEW QUESTION # 19
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?

  • A. Model a resource inbound in the location master.
  • B. Model a transportation resorce in the location master.
  • C. Model a handling resource in the location master and goods receipt time in the material master.
  • D. Model a seperate resource in the production data structure.

Answer: B,C


NEW QUESTION # 20
Which materials have a negative quantity in a bill of materials or in a recipe?

  • A. Continuous flow materials
  • B. Waste products
  • C. Co-products
  • D. By-products
  • E. Bulk materials

Answer: A,C,D


NEW QUESTION # 21
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

  • A. Planning mode
  • B. Scheduling control
  • C. Finiteness level
  • D. Direction
  • E. Fixed pegging

Answer: A,B,D


NEW QUESTION # 22
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Setup matrix
  • B. Operation network
  • C. Resource network
  • D. Work center hierarchy

Answer: D


NEW QUESTION # 23
What is the purpose of a reporting point confirmation in repetitive manufacturing?

  • A. To stage different components for a production line simultaneously
  • B. To determine the work in progress along the production line
  • C. To provide timely updates of inventory management for the staged components
  • D. To reduce the total production lead time for along production line

Answer: B,C


NEW QUESTION # 24
What type of time element can be reduced by strategy settings while dispatching?

  • A. Transportation time
  • B. Queue time
  • C. Wait time
  • D. Setup time

Answer: B,C


NEW QUESTION # 25
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?

  • A. Plant
  • B. Material
  • C. Work center
  • D. Production version

Answer: B,C


NEW QUESTION # 26
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

  • A. Material staging for nex order in sequence
  • B. Posting of goods receipt for the product
  • C. Posting of production costs to the production cost collector
  • D. Reduction of associated capacity requirements
  • E. Archiving of documents for assembly scrap

Answer: B,C,D


NEW QUESTION # 27
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)

  • A. Use a propagation range.
  • B. Use a planning group.
  • C. Use a resource group.
  • D. Use heuristic.

Answer: D


NEW QUESTION # 28
When do you use variant bills of materials (BOMs)?

  • A. When multiple materials also have similar BOMs
  • B. When a material has a configurable BOM
  • C. When a material has multiple BOMs
  • D. When multiple materials have multiple BOMs

Answer: D


NEW QUESTION # 29
Which chart types does the tabular planning table provide in SAP S/4HANA

  • A. Order (pool) chart
  • B. Work center capacities chart
  • C. Capacity requirements chart
  • D. Order (dispatched) chart

Answer: B,C


NEW QUESTION # 30
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you deliver a sales order
  • B. When the MRP result are saved
  • C. When you create a planned order
  • D. When you create a sales order

Answer: D


NEW QUESTION # 31
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?

  • A. Specify a negative offset time in the strategy profile.
  • B. Specify a positive planning horizon in the strategy profile.
  • C. Specify a positive offset time in the strategy profile.
  • D. Specify a negative lanning horizon in the strategy profile.

Answer: A


NEW QUESTION # 32
......

Get C_TS422_2021 Braindumps & C_TS422_2021 Real Exam Questions: https://www.testsimulate.com/C_TS422_2021-study-materials.html