NEW QUESTION 34
The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.
- A. The Costing Interfaced Attribute is enabled in the resource definition.
- B. The Costing Interfaced Attribute is not enabled in the resource definition.
- C. The item was made inactive after the Work Order transaction.
- D. The Manage Item Rules setup is not complete.
Answer: B
NEW QUESTION 35
Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the ManufacturingCloud?
- A. Use ibots to create the report.
- B. Use Business Intelligence answers to create the report.
- C. Use the Manufacturing subject area to select the report columns and create the report.
- D. Use Business Intelligence publisher to create a template anduse that template to create the report.
Answer: B,D
Explanation:
Explanation
You can use Oracle Transactional Business Intelligence to create analysis and Oracle Business Intelligence Publisher to create reports.
NEW QUESTION 36
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?
- A. Ensure the item isa standard item with a secondary item structure.
- B. Select a resource that is to be used inautomatic work definition by enabling the attribute Default for automatic work definition.
- C. Ensure there is only one default standard operation at a given point in time.
- D. Ensure the predefined work definition name ORA_MAIN name is active.
- E. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
Answer: A,D,E
NEW QUESTION 37
Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the MorningShift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?
- A. Select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
- B. Select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.
- C. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 40% against the resource LATHE in the Evening Shift column.
- D. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
- E. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.
- F. Do not select the Available24 Hours check box and in the Resource Availability region, enter 60% against the resource LATHE in the Morning Shift column.
Answer: A,F
NEW QUESTION 38
Identify the three sources from which supply chain orchestration (SCO) can create the work orders.
- A. Order Management
- B. Quality
- C. Procurement
- D. Inventory Min-Max Planning
- E. Planning
Answer: A,C,E
NEW QUESTION 39
Identify three requirements fulfilled by nonstandard work orders.
- A. Prototype
- B. Rework
- C. Repair
- D. Rescheduling
Answer: A,B,C
NEW QUESTION 40
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?
- A. Populate Descriptive flexfields
- B. Create Work Definitions
- C. Update Work Definitions
- D. Create and update ATO (Assemble To Order) model work definitions
Answer: A,D
NEW QUESTION 41
The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.
- A. Complete using quantity completion
- B. Change Move status to Ready.
- C. Complete with Details
- D. Quick Complete
- E. Change status of Operation to completed
Answer: C,D
NEW QUESTION 42
While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied.
1. Template: Finished Goods (WIP = No, Customer Ordered =Yes)
2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)
Identify the Item Attribute values in the application.
- A. WIP = Yes, Customer Ordered = Yes
- B. WIP = No, Customer Ordered = Yes
- C. WIP = No, CustomerOrdered = No
- D. WIP = Yes, Customer Ordered = No
Answer: B
NEW QUESTION 43
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.
- A. Update Firm flag in the Details region of the Edit Work Definition Names page.
- B. Update Supply Plan Options, Overwrite Firm Planned Orders = None.
- C. Update Firm flag in the Details region of the Edit Work Order page.
- D. Update Firm flag in the Details region of the Edit Work Definition page.
Answer: B,C
NEW QUESTION 44
A manufacturing cloud user wants to print information available in the work order in PDF.
Identify the three reports that the user can print directly from the work order screen using the Print PDF action.
- A. Bill of material
- B. Print Component List
- C. Work Order Traveler
- D. Resource List
- E. Print Labels
Answer: B,C,E
NEW QUESTION 45
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and thecorresponding HTTP action available with Manufacturing Cloud.
- A. Work Orders PATCH method
- B. Work Order Status GET method
- C. Work Orders GET method
- D. Work Order Status POST method
- E. Resource transaction GET method
- F. Resource transaction POST method
Answer: A,B,C,F
NEW QUESTION 46
A plantruns 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours.
The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
- A. 12:30 PM
- B. 4:00 PM
- C. 2:00 PM
- D. 1:00 PM
- E. 8:00 PM
Answer: B
NEW QUESTION 47
As a production supervisor, you require immediate access to critical shop floor execution systems to take actionwhile on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?
- A. Creating a new standard or non standard work order
- B. Reviewing customer information of work orders
- C. Releasing work orders using quick swipe details
- D. Reviewing operation, component, and resource detail
- E. Executing standard work order and updating item and resource usage
- F. Searching for work orders and sending them through e-mail
Answer: B,C,D,F
NEW QUESTION 48
In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transferthe assembly to cost accounting in frozen type.
- A. Create Accounting Distributions.
- B. Transfer transactions from production to Costing.
- C. Define acost planning scenario with Material, Resource, Overhead cost plans, and work definition.
- D. Build cost planning scenario and perform cost roll up.
- E. Transfer Transactions from Inventory to Costing.
- F. Publish cost planning scenario to Accounting.
Answer: A,C,E
NEW QUESTION 49
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.
- A. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.
- B. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.
- C. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.
- D. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.
Answer: A
NEW QUESTION 50
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?
- A. The Supply Chain Orchestration Functional Area
- B. The Manage product and Child Value Sets task
- C. The Manage Items Profile Options tasks
- D. The Manufacturing Master Data Functional Area
Answer: D
NEW QUESTION 51
In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can report the excess production completion?
- A. Overcompletion Tolerance Type = Percentage, value = 0
- B. Overcompletion Tolerance Type = Percentage, value = 100
- C. Overcompletion Tolerance Type = Percentage, value > 0
- D. Overcompletion Tolerance Type = Amount,value = 0
- E. Overcompletion Tolerance Type = Amount, value > 0
Answer: A,C,D
NEW QUESTION 52
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.
- A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
- B. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
- C. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units inDefault Availability column.
- D. Click Outsidethe existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.
Answer: D
NEW QUESTION 53
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.
- A. Manufacturing Lead Time
- B. Production Line
- C. Operations
- D. Operation Items
- E. Resources
Answer: C,D,E
NEW QUESTION 54
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception andwho gets notified after an exception is raised?
- A. The Production Operator can report and exception and the application generates a notification that is sent to all users who have access to the manufacturing plant.
- B. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification.
- C. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.
- D. The Production Operator can report anexception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.
Answer: D
NEW QUESTION 55
TheManufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day andNight Shift.
Identify the correct sequence of steps to achieve this requirement.
- A. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
- B. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
- C. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
- D. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
Answer: D
NEW QUESTION 56
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?
- A. Manufacturing Supervisor
- B. Production Supervisor
- C. Production Operator
- D. Manufacturing Engineer
- E. Production Engineer
Answer: D
NEW QUESTION 57
......