Get New 2022 Valid Practice To your H35-912-ENU Exam (Updated 175 Questions)
Huawei Certified Specialist H35-912-ENU Exam Practice Test Questions Dumps Bundle!
NEW QUESTION 83
Which of the following are part of the server survey preparation? (Multiple choice)
- A. Communicate with the management of the bureau to determine the time of the survey
- B. Print engineering survey data sheet
- C. Understand the device configuration of the site
- D. Fill in the data sheet of the engineering survey
Answer: A,B,C
NEW QUESTION 84
Regarding OceanStor V3 storage, which of the following statements is incorrect?
- A. Cascading cables across cabinets between cabinets is recommended to use common fibers for cascading.
- B. The equipment placed shall meet the requirements of the power distribution design of the whole cabinet and the local heat dissipation of the equipment room according to the actual situation.
- C. The chute requirements of the cabinet are greater than 50 kg, and the chute of the 6U control frame is required to bear a weight of 95 kg.
- D. At least 120cm between the cabinet and the cabinet
Answer: A
NEW QUESTION 85
How many 3.5-inch business hard drives (SATA) does the FusionStorage capacity storage server support?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION 86
Which is the most important purpose of wearing safety shoes when climbing a tower?
- A. Anti-foot
- B. Sun protection
- C. Flood prevention
- D. Non-slip
Answer: D
NEW QUESTION 87
Regarding the MA5800 frame type equipment, the equipment installation environment quality standards, what are the correct statements? (Multiple Choice)
- A. Customer's PGND cable, GND cable of primary power supply, wire diameter and power supply mode of a 48V cable to PDF or distribution box, subject to engineering design documents and company shipments, to meet equipment operation and capacity expansion requirements.
- B. No fire and anti-static measures are required in the equipment room.
- C. The AC protection ground of the AC power supply should be reliably connected to the AC protection ground. The GND grounding and PGND grounding provided by the customer must be connected to the same grounding body.
- D. AC power supply related parameters are in line with the long-term safe operation of the equipment. The equipment room AC power system should have a lightning protection unit, and the lightning protection unit should be grounded reliably.
Answer: A,C,D
NEW QUESTION 88
The OceanStor V3 series of next-generation storage products support 240v high-voltage DC input.
- A. False
- B. True
Answer: A
NEW QUESTION 89
Which statement is correct about the working principle of the FTTx key technology PON?
- A. PON is the abbreviation of Passive Optical Network.
- B. SFU is a device directly connected to the upper layer network in the PON upper layer network.
- C. The ONU completes the PON service forwarding and the interconnection of the upper layer network.
Answer: A
NEW QUESTION 90
If you are sitting in the back seat of the car, there is no need to wear a seat belt.
- A. False
- B. True
Answer: A
NEW QUESTION 91
At the job site, construction workers cannot wear casual shoes, slippers, and sandals.
- A. True
- B. False
Answer: A
NEW QUESTION 92
Regarding power-on and power-off, which of the following statements is correct? (Multiple Choice)
- A. Please wait at least 1 minute after turning off the power, then turn the power back on.
- B. After turning off the power, you can turn it back on immediately.
- C. Do not cut off the power before the hard disk running indicator stops flashing to avoid damage to the hard disk and data loss.
- D. Do not plug or unplug cables and FRU (Reid Replaceable Unit) modules during power-on, otherwise data may be lost.
Answer: A,C,D
NEW QUESTION 93
All "high-risk operations" can only be implemented during the "00: 00--06: 00" time period.
- A. False
- B. True
Answer: A
NEW QUESTION 94
Which of the following does the safety accident work focus on?
- A. Timely notification
- B. Notification after processing
- C. Prevention
- D. Immediate emergency response
Answer: C
NEW QUESTION 95
Which of the following is the work done during the verification phase after "high-risk operation"?
- A. Confirm the operation board
- B. Recording of major operational records
- C. Network test verification
- D. Confirmation of project operation completion
Answer: C
NEW QUESTION 96
Which of the following is the security protection technology for the device?
- A. Handling equipment should pay attention to balance
- B. Gloves must be worn when unpacking the box
- C. Remove flammable materials before high temperature operation
- D. Wear an anti-static wrist when debugging
Answer: D
NEW QUESTION 97
The OceanStor 18000 cabinet is packed in wooden cases and has a good material to accommodate a variety of environments. If the goods do not need to be installed after the customer arrives at the site, you can find open space to store.
- A. False
- B. True
Answer: A
NEW QUESTION 98
What is the high-end storage size of the OceanStor 18000 V3 series (including packaging)?
- A. 2000mm*6000mm*1232mm
- B. 2176mm*10000mm*1465mm
- C. 2000mm*6000mm*1200mm
- D. 2176mm*1000mm*1465mm
Answer: D
NEW QUESTION 99
The AC protection ground of the AC power supply should be reliably connected to the AC protection ground. The GND ground and PGND grounding provided by the customer must be connected to the same grounding body.
- A. True
- B. False
Answer: A
NEW QUESTION 100
Which of the following statements about the development of the access network is correct?
- A. First, broadband services emerged, and then narrowband voice services were born.
- B. First, optical access occurs, and then the copper access network appears.
- C. First voice (narrowband) access, followed by broadband access, followed by FITx optical access
Answer: C
NEW QUESTION 101
For safety, the 6U control box should be handled by four people.
- A. True
- B. False
Answer: A
NEW QUESTION 102
What is the correct statement about the layout specification of the OceanStor 18000 V3 storage cable? (Multiple Choice)
- A. The wire diameter of the power cable and ground wire of the equipment should meet the power distribution requirements of the equipment.
- B. When the cable is laid, it should be straightened out without bending
- C. The bending radius of the fiber placement should not exceed 50mm
- D. The power cable and ground wire should be smooth at the turn.
Answer: A,B,D
NEW QUESTION 103
In the OceanStor V3 series of next-generation storage products, high-density frames and normal frames can be cascaded behind the same SAS port.
- A. False
- B. True
Answer: A
NEW QUESTION 104
......
Fully Updated Dumps PDF - Latest H35-912-ENU Exam Questions and Answers: https://www.testsimulate.com/H35-912-ENU-study-materials.html