Welcome to TestSimulate

Pass Your Next Certification Exam Fast!

Everything you need to prepare, learn & pass your certification exam easily.

365 days free updates. First attempt guaranteed success.

C_TS411_2022 Dumps - Kickstart your Career with Real Updated Questions [Q10-Q27]

Share

C_TS411_2022 Dumps - Kickstart your Career with Real  Updated Questions

Earn Quick And Easy Success With C_TS411_2022 Dumps

NEW QUESTION # 10
What do you have to keep in mind when overwriting characteristic for a specific class?

  • A. This change applies only to the characteristic, when it is used in every class.
  • B. The status of this characteristic is automatically set to locked.
  • C. The status of this characteristic is automatically set to incomplete.
  • D. This change applies only to the characteristic, when it is used in this class.

Answer: D


NEW QUESTION # 11
You work with cross-plant and plant-specific Product Master statuses. Which status has the highest priority?

  • A. The most restrictive status.
  • B. The least restrictive status.
  • C. The plant-plant specific status.
  • D. The cross-plant status.

Answer: D


NEW QUESTION # 12
You are working with VC Modeling Environment PMEVC. Complete object dependencies are created by drag & drop of one or more characteristic values into a BOM item.What can be created with this drag & drop functionality?Note: There are 2 correct Answers to this question.

  • A. Local object dependencies only
  • B. Selection conditions only
  • C. Selection conditions and procedures
  • D. Local and global object dependencies

Answer: C,D


NEW QUESTION # 13
Why is a Work Center assigned to a Cost Center?

  • A. For capacity to use shift sequences
  • B. For costing to use activity types
  • C. For assignment to find suitable people
  • D. For scheduling to determine transportation time and queue time

Answer: B


NEW QUESTION # 14
What is the advantage of the Engineering Workbench in comparison to standard material BOM and routing maintenance?Note: There are 3 correct Answers to this question.

  • A. Material BOMs and routings can be processed together.
  • B. Material BOMs, routings, work centers, and material masters can be created and changed.
  • C. Using a special, optional lock logic, several people can make changes to the same material BOMs and/or routings.
  • D. You can save changes to material BOMs and/or routings and release them for other persons without leaving the Engineering Workbench.
  • E. Only the Engineering Workbench allows you to make changes to material BOMs and routings using Engineering Change Management.

Answer: A,C,D


NEW QUESTION # 15
Which configuration processes/scenarios are supported for both processing modes?

  • A. Plan./Production Order, Sales Order (SET) only
  • B. Plan./Production Order, Order BOM, Sales Order (SET)
  • C. Plan./Production Order, Order BOM only
  • D. Sales Order (SET), Order BOM only

Answer: B


NEW QUESTION # 16
Which type of object dependencies must contain $self, $parent, or $root at least once?

  • A. Pre- and Selection Conditions
  • B. Constraints
  • C. Procedures
  • D. All types of object dependencies

Answer: B


NEW QUESTION # 17
You use the app Find in Classes. The result screen only shows the object ID and type. What can you do to make characteristic values inside the result screen visible?Note: There are 2 correct Answers to this question.

  • A. Change the layout inside the result screen.
  • B. Change the layout inside the class.
  • C. Change the layout inside the class type.
  • D. Change the layout inside an object.

Answer: B,D


NEW QUESTION # 18
Working with the document status, what should you keep in mind?Note: There are 2 correct Answers to this question.

  • A. It can be defined depending on document type.
  • B. It can be defined as a status network.
  • C. It can only be defined plant specific.
  • D. It can be set at object link level.

Answer: A,B


NEW QUESTION # 19
In a single-level configuration, you want to use a constraint so that if characteristic C1 has the value V1, then characteristic C2 is assigned the value V2.C1 and C2 are assigned to class (300)T_FCL00.What would be a correct complete constraint?

  • A. RESTRICTION: $self.C2 = 'V2' if $self.C1 = 'V1'
  • B. RESTRICTION: (300)T_FCL00.C2 = 'V2' if (300)T_FCL00.C1 = 'V1'
  • C. RESTRICTION: ?T_FCL00.C2 = 'V2' if ?T_FCL00.C1 = 'V1'
  • D. RESTRICTION: ?C2 = 'V2' if ?C1 = 'V1'

Answer: B


NEW QUESTION # 20
Which are the settings for material variant determination that are also made in customizing for the item categories for the sales document?Note: There are 3 correct Answers to this question.

  • A. Availability check/ATP material variant
  • B. Activate the variant matching
  • C. Setting routing determination (link or individual)
  • D. Setting BOM determination (link or individual)
  • E. Set actions for material variants

Answer: A,B,E


NEW QUESTION # 21
What do you have to keep in mind when creating a Product Master from scratch?Note: There are 2 correct Answers to this question.

  • A. An industry sector can be selected.
  • B. No organizational levels are asked.
  • C. Only files can be connected and uploaded, no document info records.
  • D. No view selection screen becomes visible.

Answer: B,D


NEW QUESTION # 22
What is the significance of the control key?Note: There are 3 correct Answers to this question.

  • A. It is a mandatory field in the Work Center.
  • B. It is a value that can be used as a default value in the routing.
  • C. It is an optional field in the Work Center.
  • D. It defines the usage of Work Centers in routings.
  • E. It is a value that can be copied to the routing as a reference.

Answer: A,B,E


NEW QUESTION # 23
Which organizational level is a Work Center assigned to?

  • A. Production supervisor
  • B. Plant
  • C. Storage location
  • D. Client

Answer: B


NEW QUESTION # 24
Which configuration process/scenario prevents the display of a BOM explosion in the sales order?
Note: There are 2 correct Answers to this question.

  • A. Order BOM with processing mode AVC
  • B. Order BOM with processing mode classic and standard settings
  • C. Sales Order (SET) for both processing modes
  • D. Planned/Production Order without BOM explosion for both processing modes

Answer: B,D


NEW QUESTION # 25
When or why do you assign production resources and tools to an operation?

  • A. To make additional production resources and tools available that do not belong to the equipment of the Work Center.
  • B. To provide additional components which cannot be assigned to the BOM.
  • C. To make them available for operation inspection only.
  • D. To map the equipment of the Work Center with production resources and tools.

Answer: A


NEW QUESTION # 26
You want to use a procedure to set a value in a single-level configuration using a variant table T1.Variant table T1 has only two characteristics C1 and C2. C1 is a key field.The following syntax is incorrect: table T1 (C1 = C1, C2 = C2)Where do you have to insert $self?

  • A. table T1 ($self.C1 = C1, C2 = C2)
  • B. table T1 (C1 = C1, C2 = $self.C2)
  • C. table T1 (C1 = C1, $self.C2 = C2)
  • D. table T1 (C1 = $self.C1, C2 = C2)

Answer: B


NEW QUESTION # 27
......

Free C_TS411_2022 pdf Files With Updated and Accurate Dumps Training: https://www.testsimulate.com/C_TS411_2022-study-materials.html