
C-IBP-2208 Exam Dumps Pass with Updated Oct-2022 Tests Dumps
C-IBP-2208 exam questions for practice in 2022 Updated 80 Questions
NEW QUESTION 46
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
- A. Demand Driven Replenishment
- B. Demand Sensing
- C. Inventory Optimization
- D. Response Planning
- E. Sales and Operations Planning
Answer: B,C,E
NEW QUESTION 47
Which features apply to quota violations modeled with the optimizer?
- A. The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.
- B. Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.
- C. Min and Max Quotas have to be the same as sourcing ratios.
- D. Quotas can be modeled for sourcing location, production, and consensus demand.
Answer: B
NEW QUESTION 48
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Target Service Level
- B. Minimum Lot Size
- C. Holding Cost Percentage
- D. Transportation Lead Time Error CV
Answer: A,B
NEW QUESTION 49
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Configure at least one calculated key figure for the planning area.
- B. Configure at most two input key figures on the same planning level in a key figure calculation.
- C. Specify a planning horizon in the planning area for each level of the assigned time profile.
- D. Assign the compound master data type and its component master data types.
Answer: C,D
NEW QUESTION 50
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the required planning level master data exists for a subset of input key figures.
- B. It checks whether the sourcing in the Production Source Item Master Data type exists.
- C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- E. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
Answer: A,C,D
NEW QUESTION 51
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
- A. Purge Non-Conforming Data
- B. Purge Master Data
- C. Create Time Periods for Time Profiles
- D. Purge Key Figure Data
Answer: B,D
NEW QUESTION 52
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Increase the use of incremental lot size beyond the frozen horizon.
- B. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
- C. Split into multiple planning areas to support weekly vs. daily planning needs.
- D. Avoid using telescopic time buckets.
- E. Keep the number of fairshare segments small.
Answer: B,C,D
NEW QUESTION 53
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
- A. This application job can be run for multiple time profiles at once.
- B. The assigned Planning Area must be active.
- C. A time profile has to be activated so that the application job can proceed.
- D. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
Answer: D
NEW QUESTION 54
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
- A. Use production lead times and offsets to manage components at the outsourced manufacturing location
- B. Ensure that the outsourced manufacturing locations have a separate subnetwork
- C. Model target inventory and stocks at the outsourced manufacturing location
- D. Model relative production costs across internal locations and outsourced manufacturing locations
Answer: D
NEW QUESTION 55
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Not adhering to maximum transport values
- B. Violation of minimum aggregated inventory values
- C. Violation of minimum resource utilization
- D. Not respecting production capacity
- E. Not-fully satisfied demands
Answer: B,C,E
NEW QUESTION 56
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.
- A. Periods are identified by an alphanumeric prefix and profiles by an integer.
- B. Both periods and profiles have start and end dates.
- C. Periods are identified by an integer and profiles by an alphanumeric prefix.
- D. Both periods and profiles are identified by a unique integer.
Answer: A,C
NEW QUESTION 57
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Capacity expansion with additional costs
- B. Adjusted production interactive values
- C. Production source validity at the start of seasonal peak
- D. Incremental production values
Answer: A
NEW QUESTION 58
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.
- A. Use Excel Cell References in the Report Editor option is selected.
- B. Users should have authorization for template administration.
- C. Activate Local Member Recognition setting is selected.
- D. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
Answer: B,C
NEW QUESTION 59
What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.
- A. Used to break down a large calculation into manageable subcalculations
- B. Used when you have more than three inputs at different planning levels in one calculation
- C. Used at any level of calculation level except the Request Level
- D. Used by end-users in planning views to help visualize cross-period calculations
Answer: A,B
NEW QUESTION 60
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
- B. Number of fair share segments Additional tiering costs (default) Inventory days of supply
- C. Number of fair share segments Additional tiering costs (default) Maximum inventory
- D. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
Answer: D
NEW QUESTION 61
For your project, you create a new planning area and consider how to create analytics and alerts for it.How can you create these objects?
- A. Merge analytics and alerts into a new planning area from any sample planning area.
- B. Create analytics and alerts in the new planning area from scratch using the Intelligent Visibility application.
- C. Use the option for copying analytics and alerts into the new planning area from the existing custom planning area.
- D. Use the option for copying analytics and alerts when creating a new planning area from the sample SAPIBP1.
Answer: D
NEW QUESTION 62
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note: There are 2 correct answers to this question.
- A. Future Consensus Forecasts and Lagged Forecast Snapshots
- B. Recommended Safety Stocks from Multistage Inventory Optimization
- C. Forecast Error CV Calculated by Manage Forecast Error Calculations app
- D. Sales Order Quantities (both historical and future open orders)
Answer: A,B
NEW QUESTION 63
......
SAP C-IBP-2208 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
Authentic C-IBP-2208 Dumps With 100% Passing Rate Practice Tests Dumps: https://www.testsimulate.com/C-IBP-2208-study-materials.html