SAP C-IBP-2202 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
  • Key Figures & Attributes
Topic 2
  • Configure supply planning, run various solvers to generate planning results
  • Solution Architecture
Topic 3
  • Define and view information with user-defined charts and dashboards
  • Supply and Response
Topic 4
  • Describe the benefits of implementing SAP's Integrated Business Planning solution
  • Create and use key figures and attributes
Topic 5
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
  • General Configuration of a Planning Area
Topic 6
  • Display, create, copy, edit, check, and activate a planning area
  • Analytics and Reporting

 

NEW QUESTION 13
You run a what-if analysis and use the scenario planning function. Which actions can you perform? Note:
There are 3 correct Answers to this question.

  • A. Display data in analytics.
  • B. Change scenario-specific master data.
  • C. Share data with other users.
  • D. Run a scenario-specific demand sensing job.
  • E. Run a scenario-specific inventory optimization job.

Answer: A,C,E

 

NEW QUESTION 14
Which of these conditions must be met to create a Local Member key figure?

  • A. Activate Local Member Recognition is selected.
  • B. Use Excel Cell References in Report Editor is selected.
  • C. A key figure is selected in the Key Figures tab in the Microsoft Excel add-in.
  • D. A key figure is created in the Planning Area app.

Answer: A

 

NEW QUESTION 15
Which of the following are features of lag-based snapshots? Note: There are 2 correct Answers to this question.

  • A. Target key figures for these snapshots must have lag as a root attribute.
  • B. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • C. Lag-based snapshots are automatically assigned to a snapshot operator.
  • D. Target key figures for these snapshots are exposed to the user in planning views.

Answer: A,C

 

NEW QUESTION 16
Which library is used by the forecasting engine for the demand sensing algorithm?

  • A. Demand library
  • B. Predictive analytics library
  • C. Heuristics library
  • D. Supply chain algorithm library

Answer: D

 

NEW QUESTION 17
You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check.
Which settings can you change and still run a successful consistency check?
Note: There are 2 correct Answers to this question.

  • A. Add a new time profile level to the time profile.
  • B. Change the past and future horizon of the levels in the time profile.
  • C. Remove an attribute assigned to the time profile level if the attribute is used in a planning level.
  • D. Change the description of the attributes in the time profile.

Answer: B,D

 

NEW QUESTION 18
Which conditions are prerequisites for key figure disaggregation?

  • A. The key figure is calculated and editable.
  • B. The key figure is stored and editable.
  • C. The key figure is set to Not Editable.
  • D. The key figure is calculated and aggregation mode is selected.

Answer: B

 

NEW QUESTION 19
Which features apply to quota violations modeled with the optimizer?

  • A. Quotas require sourcing ratios to be maintained.
  • B. Quota violation cost is maintained as an attribute as a key figure.
  • C. Quotas can be modeled for sourcing location, production, and consensus demand.
  • D. Min and Max Quotas have to be the same as sourcing ratios.

Answer: A

 

NEW QUESTION 20
Which of the following settings can you use in your supply planning background job triggered from Excel?
Note: There are 2 correct Answers to this question.

  • A. Type of algorithm to use
  • B. UOM to ID
  • C. Planning unit
  • D. Target currency

Answer: A,B

 

NEW QUESTION 21
You need to create time periods for the time profile in a planning area. What should you be aware of when executing the Create Time Periods application job?

  • A. This application job can be run for multiple time profiles at once.
  • B. The planning area with this time profile must be activated so that the application job can proceed.
  • C. A time profile has to be activated so that the application job can proceed.
  • D. This application job cannot be scheduled for immediate start.

Answer: B

 

NEW QUESTION 22
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed? Note: There are 2 correct Answers to this question.

  • A. Planning results can be generated faster by the optimizer.
  • B. Push and Pull production models are used by the optimizer.
  • C. Finite heuristics can achieve demand prioritization and pegging.
  • D. Prioritization of demand elements one by one is achieved by heuristics.

Answer: B,C

 

NEW QUESTION 23
Which of the following are the key features of SAP Supply Chain Control Tower? Note: There are 2 correct Answers to this question.

  • A. Ability to use task and case management
  • B. Ability to create smart alerts
  • C. Ability to create a feasible plan
  • D. Ability to balance demand and supply and attain financial targets

Answer: A,B

 

NEW QUESTION 24
Which of the following approaches could you take to reduce run times of an optimizer? Note: There are
2 correct Answers to this question.

  • A. Split into multiple planning areas to support weekly vs. daily planning needs.
  • B. Increase the use of incremental lot size beyond the frozen horizon.
  • C. Use a subnetwork ID to reduce the size of the problem.
  • D. Avoid using telescopic time buckets.

Answer: C,D

 

NEW QUESTION 25
What are S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments. Additional tiering costs (default). Target inventory violation cost
  • B. Number of fair share segments. Maximum inventory. Additional tiering costs (default)
  • C. Number of fair share segments. Additional tiering costs (default). Number of fair share segments late delivery
  • D. Number of fair share segments. Maximum days of coverage. Number of fair share segments late delivery
  • E. You want to copy a custom planning area that was built during the SAP IBP implementation to model a separate process.

Answer: C

 

NEW QUESTION 26
You have set up infinite S&OP heuristics for unconstrained planning. What must you do to model inputs as constraints?
Note: There are 2 correct Answers to this question.

  • A. Set minimum and maximum lot sizes.
  • B. Create product substitutions.
  • C. Model adjusted transport receipts.
  • D. Enter transportation lead times.

Answer: C,D

 

NEW QUESTION 27
How can you make charts and dashboards private?

  • A. Enable the relevant settings in the global configuration parameters.
  • B. Choose only relevant key figures and filters in the Analytics Advanced application.
  • C. Enable the relevant settings in the Analytics Advanced and Dashboards Advanced applications.
  • D. Set restrictions for charts in the Permission filter application.

Answer: A

 

NEW QUESTION 28
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?
Note: There are 2 correct Answers to this question.

  • A. It belongs to a simple or compound master data type.
  • B. Its data type is INTEGER and its length has been specified.
  • C. It should be a non-key attribute of the master data type.
  • D. The length of the attribute needs to be 18 digits.

Answer: A,C

 

NEW QUESTION 29
You define fixing for a key figure. Which of the following functions are available for this key figure? Note:
There are 2 correct Answers to this question.

  • A. Fixing is possible for a certain period, including all child values in the hierarchy.
  • B. Fixing is possible for system editable key figures.
  • C. Fixing is possible for manually editable key figures.
  • D. Fixing is possible for a certain quantity of a key figure value.

Answer: A,C

 

NEW QUESTION 30
You are reviewing the master data types for supply planning. Which master data types are compound master data types? Note: There are 2 correct Answers to this question.

  • A. SOURCECUSTOMER
  • B. sourcelocation
  • C. SOURCEPRODUCTION
  • D. LOCATIONFR

Answer: A,B

 

NEW QUESTION 31
You are configuring disaggregation for the KF1 key figure. Which methods can you apply? Note: There are 3 correct Answers to this question.

  • A. Disaggregation according to a user-defined expression
  • B. Disaggregation in batch triggered by an application job
  • C. Proportional disaggregation by using KF2 in the expression
  • D. Disaggregation according to an equal split
  • E. An internal system-generated disaggregation

Answer: A,C,D

 

NEW QUESTION 32
Which of the following are features of the S&OP process templates? Note: There are 2 correct Answers to this question.

  • A. New instances of templates allow for re-use of the same processes again.
  • B. All process templates are assigned to dashboards.
  • C. The number of steps in a process template is the same for all implementations.
  • D. Each step depicted in the template can have tasks associated with it.

Answer: B,D

 