NEW QUESTION # 37
Inspectors perform tests on linings that they may not perform on exterior coatings because

  • A. coatings are more durable than linings.
  • B. linings protect the contents and the container.
  • C. coatings are expected to degrade over time.
  • D. linings are more durable than coatings.

Answer: B


NEW QUESTION # 38
The solvent sensitivity/solvent wipe test (ASTM D4752) is used to determine the cure of

  • A. inorganic zincs.
  • B. urethanes.
  • C. powder coatings.
  • D. epoxies.

Answer: A


NEW QUESTION # 39
When environmental enclosures are being used an inspector needs to be concerned about:

  • A. a), b), and c)
  • B. Air changes
  • C. Lighting
  • D. Structural integrity

Answer: A


NEW QUESTION # 40
Centrifugal blast cleaning requires:

  • A. A large volume of air to propel the abrasive
  • B. Very large nozzles
  • C. The use of single use abrasives
  • D. Well maintained blast wheels

Answer: D


NEW QUESTION # 41
The standards defining surface cleanliness achieved by centrifugal blast cleaning are:

  • A. Slightly different to air blast cleaning
  • B. The same as air blast cleaning
  • C. Comparable to air blast cleaning
  • D. Different than air blast cleaning

Answer: B


NEW QUESTION # 42
Coating surveys may include which steps?
Select All That Apply:

  • A. Evaluate the coatings performance
  • B. Summarize the collected data
  • C. Develop a survey plan
  • D. Schedule the remedial work

Answer: A,B,C,D


NEW QUESTION # 43
The Inspectors' goal at the Pre-Job Conference is to:

  • A. Manage the meeting so it doesn't go off topic
  • B. Discuss contractual requirements
  • C. Obtain a clear understanding of the Specification
  • D. Take accurate meeting minutes for distribution

Answer: C


NEW QUESTION # 44
Dehumidification is defined as the removal of moisture vapor from the air to

  • A. provide worker comfort.
  • B. lower its temperature
  • C. lower its dew point,
  • D. raise its relative humidity.

Answer: C


NEW QUESTION # 45
The primary purpose of Fireproofing coatings are to provide:

  • A. Explosion resistance
  • B. Preferential fuel for the fire
  • C. Temporary protection for the structure
  • D. fire extinguishing characteristics

Answer: C


NEW QUESTION # 46
The cost of qualified Coating Inspection is normally offset by:

  • A. Lower Coating Life Cycle Costs
  • B. Lower Safety Enforcement Costs
  • C. Lower Application Costs
  • D. Lower Supervision Costs

Answer: A


NEW QUESTION # 47
You have just your NACE CIP Level 2 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:

  • A. Accept assignment without hesitation
  • B. Meet with the prospective employer to scope of your role
  • C. Review the NACE Attestation prior to making a decision
  • D. Advise the prospective employer that you cannot accept the position

Answer: C


NEW QUESTION # 48
When measuring the Dry Film Thickness Of liquid coatings applied to galvanized ferrous substrates the most commonly used instrument is the:

  • A. Ultra Sonic DFT Gauge
  • B. Tooke Gauge
  • C. Magnetic Gauge
  • D. Eddy Current Gauge

Answer: B


NEW QUESTION # 49
When NACE/SSPC WJ 1 is referenced; what type of equipment would the Inspector expect to see on the job:

  • A. Power Tools
  • B. Abrasive Blasting Equipment
  • C. Scarifiers
  • D. Water Jetting Equipment

Answer: D


NEW QUESTION # 50
It is always possible to see moisture on a steel substrate:

  • A. False
  • B. True

Answer: A


NEW QUESTION # 51
When working with someone who is very concerned about Stability and maintaining adherence to the status-quo, the Inspector should try to:

  • A. Challenge their value to the team and try to get them out of their comfort zone
  • B. Make sure they are the center of attention in all site meetings
  • C. Give them as much advance notice as possible about upcoming changes
  • D. Implement immediate to get them motivated

Answer: C


NEW QUESTION # 52
You are a NACE Level 2 Coating Inspector who has just arrived on a job in progress where there is no Inspection and Test Plan (ITP). The first morning you arrive the job is behind schedule and you are asked to take DIY Film Thickness readings.
Your FIRST preferred course of action is to:

  • A. Refuse to take readings until an is in place
  • B. Use a generally accepted industry standard and to take readings
  • C. Call your supervisor
  • D. Develop your own methodology and proceed take the readings

Answer: B


NEW QUESTION # 53
When observing fabrication defects the NACE Inspector should:

  • A. Consult the specification to determine how they should be treated
  • B. Write an NCR and call the fabricator
  • C. Stop the job immediately
  • D. Require they be corrected prior to coating

Answer: A


NEW QUESTION # 54
Application of Thermal Spray Coatings requires:

  • A. No particular skills
  • B. The same skills as liquid coatings
  • C. The same skills as welding
  • D. Specialized skills supported by training and experience

Answer: D


NEW QUESTION # 55
Individuals conducting Coating Surveys should:

  • A. Always be NACE Level 3 Certified Inspectors
  • B. Always be trained and experienced Coating Industry
  • C. Always be NACE or SSPC Protective coating Specialists
  • D. Always be experienced Specification Writers

Answer: B


NEW QUESTION # 56
Inspection and Test plans are developed by referencing:

  • A. The Specification, TDS, relevant Standards and Codes
  • B. The Specification, Safety Manual, Relevant Standards and Codes
  • C. The Specification, Application Guidelines, 'Relevant Standards and Codes
  • D. The Specification, SDS, relevant Standards and Codes

Answer: A