Microsoft Server Virtualization with Windows Server Hyper-V and System Center (074-409) Free Practice Test
Question 1
You administer an environment that uses a Windows Server 2012 R2 Hyper-V cluster and System Center 2012 R2 Virtual Machine Manager (VMM). You plan to deploy two virtual machines (VMs) that host a line-of-business (LOB) application.
The VMs must reside on the same Hyper-V host server at all times. The LOB application does NOT require high availability.
You need to deploy the VMs.
What should you do?
The VMs must reside on the same Hyper-V host server at all times. The LOB application does NOT require high availability.
You need to deploy the VMs.
What should you do?
Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 2
HOTSPOT
You have an environment that contains the servers as shown in the following table:

You purchase a physical server that supports out-of-band management to deploy as a bare-metal Hyper-V host server.
Administrators must be able to deploy standard Hyper-V host server images to bare-metal computers by using the least amount of administrative effort.
You need to prepare the environment.
What should you use? To answer, select the appropriate option from each drop-down menu in the answer area.

You have an environment that contains the servers as shown in the following table:

You purchase a physical server that supports out-of-band management to deploy as a bare-metal Hyper-V host server.
Administrators must be able to deploy standard Hyper-V host server images to bare-metal computers by using the least amount of administrative effort.
You need to prepare the environment.
What should you use? To answer, select the appropriate option from each drop-down menu in the answer area.

Correct Answer:

Question 3
You administer a Windows Server 2012 R2 server that has the Hyper-V role installed. You plan to test an update to a virtual machine (VM) in a production environment. You must meet the following requirements:
- migrate the VM to another Hyper-V host as quickly as possible
- ensure that the VM configuration is preserved after the migration is complete
You need to migrate the virtual machine. What should you do first?
- migrate the VM to another Hyper-V host as quickly as possible
- ensure that the VM configuration is preserved after the migration is complete
You need to migrate the virtual machine. What should you do first?
Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 4
A company has the following servers:

You are implementing the virtualization storage.
You need to assign Server Message Block (SMB) 3.0 file shares to the Hyper-V host servers.
Which three actions should you perform? Each answer presents part of the solution.

You are implementing the virtualization storage.
You need to assign Server Message Block (SMB) 3.0 file shares to the Hyper-V host servers.
Which three actions should you perform? Each answer presents part of the solution.
Correct Answer: A,C,F
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 5
You administer two Windows 2012 R2 servers that have the Hyper-V role installed. You plan to deploy a new Hyper-V cluster. The cluster instance must NOT be added to Active Directory. You need to deploy the cluster. What should you do?
Correct Answer: C
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 6
HOTSPOT
You plan to implement guest clustering that contains two virtual machines (VMs). You review the following information from one of the VMs:
The Validate File System test results in the Failover Clustering Validation Report, as
The Features page of the Add Roles and Features Wizard, as shown in the Features Wizard exhibit (Click the Exhibit button.)
The disk management settings, as shown in the Disk Management exhibit (Click the Exhibit button.)
shown in the Validation Report exhibit (Click the Exhibit button.)



You need to ensure that you can implement guest clustering.
For each of the following statements, select Yes if the statement is true. Otherwise, select No. Each correct selection is worth one point.

You plan to implement guest clustering that contains two virtual machines (VMs). You review the following information from one of the VMs:
The Validate File System test results in the Failover Clustering Validation Report, as
The Features page of the Add Roles and Features Wizard, as shown in the Features Wizard exhibit (Click the Exhibit button.)
The disk management settings, as shown in the Disk Management exhibit (Click the Exhibit button.)
shown in the Validation Report exhibit (Click the Exhibit button.)



You need to ensure that you can implement guest clustering.
For each of the following statements, select Yes if the statement is true. Otherwise, select No. Each correct selection is worth one point.

Correct Answer:

Question 7
A Windows Server 2012 R2 Hyper-V host server has four network adapters that are connected to two different network switches. The server contains a virtual machine named NYC-WEB.
You have the following requirements:
- increase the available bandwidth for NYC-WEB - implement network fault tolerance for NYC-WEB without modifying network switch configurations - use the least amount of administrative effort
You need to configure the Hyper-V environment. What should you do first?
You have the following requirements:
- increase the available bandwidth for NYC-WEB - implement network fault tolerance for NYC-WEB without modifying network switch configurations - use the least amount of administrative effort
You need to configure the Hyper-V environment. What should you do first?
Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 8
DRAG DROP
You administer a Windows Server 2012 R2 server that has the Hyper-V role installed. You have the following virtual machines (VMs):

You also have the following two switches:

VM-Server1 has network connectivity to VM-Server2 and VM-Server3, as well as the host server, VM-Server4 has network connectivity to VM-Server5, but NOT to the host server.
You need to configure VM-Server6 to ensure that VM-Server6 has network connectivity only to the other test VMs.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order,

You administer a Windows Server 2012 R2 server that has the Hyper-V role installed. You have the following virtual machines (VMs):

You also have the following two switches:

VM-Server1 has network connectivity to VM-Server2 and VM-Server3, as well as the host server, VM-Server4 has network connectivity to VM-Server5, but NOT to the host server.
You need to configure VM-Server6 to ensure that VM-Server6 has network connectivity only to the other test VMs.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order,

Correct Answer:

Question 9
DRAG DROP
A company uses System Center 2012 R2 Virtual Machine Manager (VMM).
You need to create and assign a self-service user role in VMM.
You have the following requirements:
- All role members must share ownership of all virtual machines (VMs) that any role
member creates.
- Role members must be able to deploy VMs.
- Role members must NOT have authoring rights.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

A company uses System Center 2012 R2 Virtual Machine Manager (VMM).
You need to create and assign a self-service user role in VMM.
You have the following requirements:
- All role members must share ownership of all virtual machines (VMs) that any role
member creates.
- Role members must be able to deploy VMs.
- Role members must NOT have authoring rights.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Correct Answer:

Question 10
DRAG DROP
You are the virtualization administrator for an organization. You manage a virtual machine (VM) by using System Center 2012 R2 Virtual Machine Manager. The VM is in a running state. You plan to use the System Preparation (Sysprep) tool to create a virtual machine template from the VM.
You need to save a copy of the VM before you run the Sysprep tool.
Which actions should you take? To answer, drag the appropriate actions to the correct locations in the answer area. Each action may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

You are the virtualization administrator for an organization. You manage a virtual machine (VM) by using System Center 2012 R2 Virtual Machine Manager. The VM is in a running state. You plan to use the System Preparation (Sysprep) tool to create a virtual machine template from the VM.
You need to save a copy of the VM before you run the Sysprep tool.
Which actions should you take? To answer, drag the appropriate actions to the correct locations in the answer area. Each action may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

Correct Answer:
