Question 1
Which of the following master data is mandatory for production order processing, when material reservations and capacity requirements for operations should be generated automatically?
(Choose two.)
(Choose two.)
Correct Answer: B,C
Question 2
What are the consequences of a confirmation of an operation? (Choose two.)
Correct Answer: A,B
Question 3
In production order processing, for which of the following objects can you enter a confirmation?
(Choose three.)
(Choose three.)
Correct Answer: A,B,E
Question 4
Which of the following efforts can be minimized using the KANBAN procedure?
Correct Answer: B
Question 5
Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?
Correct Answer: A
Question 6
Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released?
Correct Answer: D
Question 7
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default. However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
What procedure would you recommend to the project team for setting the planning horizon on the system side?
Correct Answer: B
Question 8
In the task list, there is the possibility to work with suboperations.
What can you do in more detail by using suboperations? (Choose two.)
What can you do in more detail by using suboperations? (Choose two.)
Correct Answer: A,C