Question 1
Which of the following steps are necessary to generate an RFC connection that can be used for the APO Core Interface?
Note: There are 3 correct answers to this question.
Note: There are 3 correct answers to this question.
Correct Answer: B,C,D
Question 2
You have to define selections in SNP.
Apart from the SNP Planner, which fields can you use?
Apart from the SNP Planner, which fields can you use?
Correct Answer: D
Question 3
You can select PP/DS PDS instead of PP/DS PPM to integrate a process with APOPP/DS.
Which of the following standard ECC functions require the PP/DS PDS for the integration?
Note: Configuration scheme VC is used.
Note: There are 3 correct answers to this question.
Which of the following standard ECC functions require the PP/DS PDS for the integration?
Note: Configuration scheme VC is used.
Note: There are 3 correct answers to this question.
Correct Answer: A,C,D
Question 4
Your customer creates an infinite multilevel MRP run for a finished product and its components using the process heuristic SAP_MRP_001.
Product heuristics are not maintained in the product masters and no strategy profile is selected in the planning run.
How are the strategy settings derived in this situation?
Product heuristics are not maintained in the product masters and no strategy profile is selected in the planning run.
How are the strategy settings derived in this situation?
Correct Answer: A
Question 5
The system offers you two process control heuristics, SAP_MRP_001 and SAP_MRP_002, when setting up the multilevel MRP run in APO-PP/DS. The APO master data includes finished products with planning procedure "4" (planning in the planning run) and components with planning procedure "3" (cover dependant requirements immediately).
What difference do you expect in the behavior of the control heuristics in this case?
What difference do you expect in the behavior of the control heuristics in this case?
Correct Answer: A
Question 6
The implementation project requires finite scheduling that considers different finiteness levels.
What controls the finiteness level?
Note: There are 2 correct answers to this question.
What controls the finiteness level?
Note: There are 2 correct answers to this question.
Correct Answer: C,E
Question 7
When using forecasting in DP, to what can you assign the forecast profile?
Note: There are 2 correct answers to this question.
Note: There are 2 correct answers to this question.
Correct Answer: D,E
Question 8
Which scenario is supported with the SNP Transport Load Builder?
Correct Answer: B