NABCEP PV Installation Professional (PVIP) Board Certification (PVIP) Free Practice Test

Question 1
A PV system designer is selecting an inverter for a 12 kW array with a maximum power point voltage range of 300-450V DC. Which inverter specification is most critical to verify compatibility?

Correct Answer: C
Question 2
Which of the following requires a UL listing or its equivalent?

Correct Answer: C
Question 3
A racking system is designed for a wind speed of 120 mph. The site's design wind speed increases to 130 mph. What is the percentage increase in wind pressure?

Correct Answer: C
Question 4
A PV system was installed in July 2017 under the 2017 NEC. The system has a string inverter located inside a garage on a wall 10 ft, from the outside wall and 1oft, from the ac load center at the point of utility connection. The PV system has a PV array on the roof. Which of the following represents the PV rapid shutdown system requirement for the controlled PV system conductors associated with this PV array?

Correct Answer: B
Question 5
Which circuits are on the utility side of a service point?

Correct Answer: B
Question 6
An installer is using ½ in lag boits to secure roof-monitoring hardware to rafters through a roof deck. Which of the following should the installer predrill?

Correct Answer: C
Question 7
Which of the following MUST be referenced for determining a site's design wind speed?

Correct Answer: D
Question 8
A 20 kW system has a measured output of 18 kW at STC. What is the total system loss?

Correct Answer: A
Question 9
A 10 kW system has a total derate factor of 0.85 and operates at 5 PSH. What is the daily output in summer with 10% soiling loss?

Correct Answer: D
Question 10
A microinverter system uses 30 modules, each rated at 320W, with an inverter efficiency of 96%. The AC output is connected to a 208V three-phase service. What is the total three-phase power output?

Correct Answer: A
Question 11
A PV array produces 10 kW at 25°C. At 50°C with a coefficient of -0.45%/°C, what is the output?

Correct Answer: A
Question 12
A PV system has a nameplate capacity of 10 kW DC and operates with a total system derate factor of 0.85.
What is the expected AC output power under standard test conditions (STC)?

Correct Answer: C
Question 13
An installer is working on a 1000V DC PV array. What is the minimum PPE required per NFPA 70E for arc flash protection?

Correct Answer: D
Question 14
A system commissioning test requires verifying rapid shutdown functionality. What is the maximum time allowed for voltage to drop below 30V per NEC 690.12?

Correct Answer: C
Question 15
A PV array is installed near a pool. What is the minimum distance required from the water's edge per NEC
690.31?

Correct Answer: A