Welcome to TestSimulate

Pass Your Next Certification Exam Fast!

Everything you need to prepare, learn & pass your certification exam easily.

365 days free updates. First attempt guaranteed success.

IBM Power Systems with POWER7 Common Sales Skills -v2 (C4040-122) Free Practice Test

Question 1
What is the minimum HMC model required to manage POWER7 or POWER7+ servers?

Correct Answer: A
Question 2
When moving an HP-UX based application workload from an HP Superdome onto a Power Systems server, which operating system will provide the easiest transition'?

Correct Answer: C
Question 3
A prospective customer is considering a Dell x86 server running Windows, VMware, and WebSphere versus a Power System running IBM i, AIX, PowerVM and WebSphere.
Which value proposition favors IBM in this situation?

Correct Answer: C
Question 4
A customer has very unpredictable short workload increases. Which automated capability of Power 770, 780 and 795 servers would satisfy this need?

Correct Answer: C
Question 5
A customer needs to decrease energy costs in their data centers. How can Power Systems servers support this requirement?

Correct Answer: D
Question 6
An existing IBM customer needs to acquire a new Power Systems server with the following characteristics:
-Must support 12 processor cores -Must accommodate the largest number of adapters in the system unit -Must fit within 4U of existing rack space
Which of the following should be proposed'?

Correct Answer: B