Welcome to TestSimulate

Pass Your Next Certification Exam Fast!

Everything you need to prepare, learn & pass your certification exam easily.

365 days free updates. First attempt guaranteed success.

PECB Certified EMS ISO 14001 Lead Auditor (ISO-14001-Lead-Auditor) Free Practice Test

Question 1
You have been nominated as audit team leader for the second recertification to ISO 14001 of ABC, a public transport organisation in a big city. The audit is planned to take place in two months.
The audit program manager asks you to review the answer provided by ABC to a nonconformity raised by another auditor during the last surveillance audit carried out eight months ago.
The nonconformity reads as follows:
*"ABC does not always communicate its relevant environmental requirements to external providers.
Evidence: A two-month contract signed with a new external provider of the maintenance for ABC's buses did not contain any relevant environmental requirements."* Which two would you consider to be the best corrective actions from ABC?

Correct Answer: A,F
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 2
The audit lifecycle describes the ISO 19011 process for conducting an individual audit.
Which two of the following are part of conducting the audit activities?

Correct Answer: D,F
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 3
ABC is a large lubricant oils manufacturer located in country A. Due to tax exemption and other economic issues, they decided to move the whole plant to a neighbouring country B. They moved every single piece of the plant (equipment, systems); the new plant has the same layout, the same dimensions, the same suppliers of raw materials and the same customers. Even more, most personnel accepted to move to country B.
They operate a third-party certified EMS; the certificate was transferred to the new plant after a half-day audit from the certification body. You are auditing ABC ' s EMS in the new location, representing ABC ' s largest customer. When interviewing the Environmental Manager (EM), you ask:
You: Can I see the plan you developed to keep under control the impact of the EMS due to the change of site?
EM: We listed all elements and processes of the EMS that might need to be changed and selected those that we considered needed a careful review and probably a revision.
Below you will find that list; select six that you consider will need to be revised.

Correct Answer: C,E,F,I,J,K
Question 4
You are conducting a Stage 2 certification audit of VitalSpark, a pharmaceutical organisation manufacturing vitamins and other healthcare medicines. In a separate area in the centre of their large site, a supplier produces oxygen supplies piped directly into the manufacturing processes of VitalSpark. They also deliver oxygen in bulk tankers to other customers. When you review the environmental aspects register, you find that the only environmental aspect recorded for this arrangement relates to the heavy goods vehicles of the supplier transiting the site.
You ask the EMS Manager about the environmental consequences to VitalSpark of this arrangement and are told that they are not significant since the supplier has its own services for water, sewage, waste and energy.
The EMS Manager tried unsuccessfully to communicate with the supplier who is located inside the VitalSpark site and outside the scope of the EMS.
You raise a non-conformance against clause 6.1.2 of ISO 14001:
" VitalSpark does not maintain documented information on aspects/impacts related to activities, products and services of the oxygen supplier. " Which combination of two of the following actions proposed by VitalSpark would permit you to close out the nonconformity?

Correct Answer: B,C
Question 5
An internal auditor of a manufacturer of aluminium products for the car industry asked to see the most recent management review minutes and found no reference to the completion of some of the current environmental objectives. He raised a nonconformity against section 9.3.c of ISO 14001 in Report IA202. The nonconformity (NC3) stated:
" Top management has not analysed why some of the environmental objectives have been met since the last management review. " When discussing the finding with the Environmental Manager, the auditor was informed that planned actions taken to complete the current environmental objectives were specifically covered in the internal audit programme and did not need any further work done.
Select one of the options which would constitute an effective response by the Environmental Manager to the nonconformity.

Correct Answer: A
Question 6
What are the primary purposes of implementing an EMS based on ISO 14001:2015? Select two.

Correct Answer: C,D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 7
An audit team leader arrives at a steel fabrication organisation that manufactures fire escape stairs to carry out a Stage 2 certification audit. At a meeting with the EMS Manager, she is informed that they have secured their largest contract from a construction organisation to manufacture and install fire escape stairs. They appointed a subcontractor to perform the installation work. The EMS Manager wants the ISO 14001 audit extended to cover the installation site.
During the audit, a team member found that several complaints had been made to the organisation regarding their installation operators being seen to dispose of excess paint into the site drains, which breached legal requirements. The EMS Manager blames the contractors they had to take on because of the big contract. The auditor raises a nonconformance against clause 8.1 of ISO 14001.
Which one of the following statements would support this finding?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).