Welcome to TestSimulate

Pass Your Next Certification Exam Fast!

Everything you need to prepare, learn & pass your certification exam easily.

365 days free updates. First attempt guaranteed success.

USGBC LEED AP Homes (Residential) (LEED-AP-Homes) Free Practice Test

Question 1
In order for a LEED home to earn a point for Materials and Resources Credit, Environmentally Preferable Products, what minimum amount of insulation must be reclaimed or salvaged?

Correct Answer: B
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 2
One strategy to help achieve Location and Transportation Credit: Community Resources in a multi-family building is to provide:

Correct Answer: C
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 3
Conditioned floor area and number of bedrooms are factors when calculating a project's Home Size Adjustment in order to achieve credit for:

Correct Answer: C
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 4
A gut rehab LEED for Homes project will maintain the building's existing exterior wall and floor framing.
Under Materials and Resources Credit, Environmentally Preferable Products category, these components get credit for being:

Correct Answer: C
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 5
How many Regional Priority Credits can a LEED for Homes v4 project pursue?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 6
The minimum required outdoor air ventilation is calculated based on the conditioned floor area of the home and the:

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 7
Which of the following products could earn one point for being reclaimed under the Materials and Resources Credit, Environmentally Preferable Products?

Correct Answer: B
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 8
Introduction of outdoor air works to improve indoor air quality by:

Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 9
The design charrette must occur no later than which phase in order to earn the Integrative Process Credit, Option 2: Design Charrette?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 10
Which important factors must be considered when calculating the design landscape water requirements?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).