ISQI ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) (CTAL-TM-UK) Free Practice Test
Question 1
What is the Risk Priority Number for risk item number 2? 2 credits
Correct Answer: D
Question 2
Identify the THREE types of formal peer reviews that can be recognized. 1 credit
Correct Answer: A,C,G
Question 3
Relying only on the information provided in the scenario, select the TWO items and/or features for which sufficient information is available to proceed with test design. 2 credits
Correct Answer: B,E
Question 4
The introduction of reviews and inspections has often failed as a process improvement action. Identify the THREE most important measures that should be taken to reduce the risk that this test process improvement will fail. 2 Credits (for 2 out of 3 correct 1 credit)
Correct Answer: A,E,F
Question 5
Which of the following is a benefit of independent testing? 1 credit
Correct Answer: B
Question 6
Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.

Based on the chart above, what is the most appropriate next test phase? 1 credit

Based on the chart above, what is the most appropriate next test phase? 1 credit
Correct Answer: D
Question 7
Which of the following would you expect to see in the master test plan? 1 credit
Correct Answer: A