IBM Workload Automation V9.2 Implementation (C2010-517) Free Practice Test
Question 1
Which two processes are specific to the dynamic agent?
Correct Answer: D,E
Question 2
When creating a new job stream using the Dynamic Workload Console, what are the minimum requirements for a job stream to be selected for launch after FINAL job stream introduces a new Plan?
Correct Answer: D
Question 3
An event processor is running on a master domain manager (MDM) when defining an event rule for a fault-tolerant agent, FTA1, which uses the generic action plug-in run command. Where is the run command executed?
Correct Answer: B
Question 4
A job in a Windows environment abends when run through IBM Tivoli Workload Scheduler (TWS). but it works when a user logs in and runs it. Which option can resolve this issue after the option is changed and netman is restarted?
Correct Answer: A
Question 5
What must occur in the case of a long-term switch from the primary master domain manager (MDM) to the backup MDM?
Correct Answer: A
Question 6
Which value must the enCarryForward global option be set tin order for incomplete job streams to carry forward when running JnextPlan -for 0000?
Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 7
Which additional feature is provided by integrating IBM Tivoli Workload Scheduler with IBM Tivoli Enterprise Console?
Correct Answer: A