IBM WebSphere Process Server V7.0 Deployment (000-608) Free Practice Test
Question 1
An integration developer has informed the deployment professional that the new business integration module being worked on is using Common Event Infrastructure (CEI) events to monitor performance during stress testing, and that the plan is to remove the CEI event emitting code before going to production. What concerns should the deployment professional raise with the integration developer?
Correct Answer: A,B
Question 2
A deployment professional is doing a manual creation of database tables for a Business Space runtime in a WebSphere Network Deployment runtime. The database is to be hosted on a remote DB2 instance. Which of the following must be done prior to beginning the creation of the database tables?
Correct Answer: A
Question 3
The deployment professional is using the Integrated Solution Console (ISC) to schedule the start of an application. In what time zone should the date be entered?
Correct Answer: B
Question 4
WebSphere Process Server (WPS) V7.0 introduces a new Service Component Architecture (SCA) container. Which of the following changes in the architecture result in improved performance?
Correct Answer: C
Question 5
A deployment professional of a WebSphere Process Server Network Deployment environment has installed and configured Business Space. The deployment professional now needs to create a second cluster and have access to both from Business Space. What must be done to support this configuration?
Correct Answer: A
Question 6
The deployment professional is in the process of implementing security in WebSphere Process Server by configuring LDAP. In the Configuration tab of standalone LDAP registry page, the deployment professional has chosen utomatically generated server identify?option so that the applicationstandalone LDAP registry page, the deployment professional has chosen ?utomatically generated server identify?option so that the application server generates the server identity that is used for internal process communication. At the end of the configuration, the deployment professional wants to change the server identify. Which of the following options is valid?
Correct Answer: D
Question 7
During the design of a large-scale high-volume topology, a deployment professional is consulting with a client on the planned design and configuration of the databases required for the messaging resources. During this discussion the deployment professional notes that it would be preferable to configure a separate database for the Business Process Choreographer (BPC) messaging engine. What is a reason for making such a suggestion?
Correct Answer: C