IBM Integration Bus V9.0, Solution Development (C9530-404) Free Practice Test
Question 1
A solution developer has created the following message flow:

The integration requirements state that the name for the output file needs to be computed from the message payload.
How can the developer implement this requirement in the Mapping node?

The integration requirements state that the name for the output file needs to be computed from the message payload.
How can the developer implement this requirement in the Mapping node?
Correct Answer: A
Question 2
A solution developer is creating a DFDL message model for a comma-separated text file that contains customer addresses. The message model structure is shown below.

During testing, the developer finds that some of the records in the data file might be blank. What modification can the developer make to the DFDL model to allow for the blank records in the data?

During testing, the developer finds that some of the records in the data file might be blank. What modification can the developer make to the DFDL model to allow for the blank records in the data?
Correct Answer: C
Question 3
A solution developer is building a solution that integrates with a COBOL application. The COBOL copybook that defines the record layout is available to the solution developer.
What should the developer do to make use of the latest IBM Integration Bus V9.0 features and create a new message model in the least number of steps?
What should the developer do to make use of the latest IBM Integration Bus V9.0 features and create a new message model in the least number of steps?
Correct Answer: B
Question 4
The embedded global cache in an integration node can be extended by connecting to:
Correct Answer: C
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 5
What is required to use a .NET node?
Correct Answer: D