IBM FileNet P8 Product Fundamentals Technical Mastery Test v1 (P2070-053) Free Practice Test
Question 1
A P8 administrator for a company just finished deploying IBM FileNet P8 V5.1. The administrator wants to use FileNet Enterprise Manager (FEM) to logon to P8 to perform further tasks. An error occurs immediately upon logging on to P8. The administrator would like to use log4j to troubleshoot the issue. Which sample log4j file should the administrator use?
Correct Answer: D
Question 2
A customer is implementing a new, highly available IBM FileNet P8 environment that will also be used for IBM Case Manager. The RDBMS that has been chosen is DB2. There will initially be three separate Object Stores used for this implementation. The Process Engine (PE) needs to be scaled to meet the business requirements. Which of the following choices both meets the requirements of this situation and conforms to IBM best practices?
Correct Answer: D
Question 3
As part of a new IBM FileNet P8 installation an installer is configuring SSL between the Process Engine and the Content Engine. The installer runs the following command to import the CA certificate to the Java keystore: \PE_installation_directory\java\jre\bin\keytool -import -file <cert_file_name> -alias <alias> -keystore cacerts -storepass <password> What is the default password?
Correct Answer: A
Question 4
Which one of the following is TRUE with FileNet P8 folders?
Correct Answer: B
Question 5
A customer sees the following ping page:

The p8_server_error.log indicates the following message:
2012-05-15T11:20:43.381Z 72D072D0 GCD FNRCE0000W - WARN A database availability issue was encountered when checking the GCD's epoch - using last cached instance. Exception was: The database access failed with the following error: ErrorCode 0, Message 'DSRA9110E: Statement is closed.' SQL: "SELECT last_epoch_id FROM FNGCD WHERE (epoch_id = 0)" 2012-05-15T11:21:14.959Z 521E521E GCD FNRCE0000W - WARN A database availability issue was encountered when checking the GCD's epoch - using last cached instance. Exception was: The server cannot get the data source FNGCDDS.
What could be the probable reason for this failure and what could rectify the issue?

The p8_server_error.log indicates the following message:
2012-05-15T11:20:43.381Z 72D072D0 GCD FNRCE0000W - WARN A database availability issue was encountered when checking the GCD's epoch - using last cached instance. Exception was: The database access failed with the following error: ErrorCode 0, Message 'DSRA9110E: Statement is closed.' SQL: "SELECT last_epoch_id FROM FNGCD WHERE (epoch_id = 0)" 2012-05-15T11:21:14.959Z 521E521E GCD FNRCE0000W - WARN A database availability issue was encountered when checking the GCD's epoch - using last cached instance. Exception was: The server cannot get the data source FNGCDDS.
What could be the probable reason for this failure and what could rectify the issue?
Correct Answer: B
Question 6
P8 follows industry practices in separating authentication (validating the identity of users) from authorization (controlling access to resources for identified users). Which of the following is TRUE for P8's handling of authentication and authorization?
Correct Answer: C
Question 7
Which of these are TYPICAL uses for extending P8 with subscription event handlers?
Correct Answer: A