IASSC Certified Lean Six Sigma Black Belt (ICBB) Free Practice Test
Question 1
Situations where standardized work needs to be incorporated include all of these except _____________________.
Correct Answer: A
Question 2
Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?
Correct Answer: B
Question 3
The two types of data that are to be used in Statistical Analysis are Attribute and Variance.
Correct Answer: A
Question 4
Following process modifications, the Null Hypothesis states that no improvement to the process has occurred. If we discover the Null Hypothesis Test was rejected when it was false that would be a(n) ________________________.
Correct Answer: D
Question 5
The class score distribution of schools in a metropolitan area is shown here along with an analysis output. Comment on the statistical significance between the Means of the two distributions. Select the most appropriate statement.
Correct Answer: B
Question 6
To be an effective Lean Six Sigma practitioner one must understand the difference between ___________________________.
Correct Answer: A
Question 7
Which one of these tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?
Correct Answer: B
Question 8
Which statements are correct about the advanced Capability Analysis shown here?

(Note: There are 3 correct answers).

(Note: There are 3 correct answers).
Correct Answer: B,C,D
Question 9
Use this data to calculate the Z Score. Average of: 92, Standard Deviation: 2, Upper Spec Limit: 101
Correct Answer: A
Question 10
"A calculated time frame that matches customer demand" is a definition of what Lean Principles term?
Correct Answer: A
Question 11
The Normal Distribution is considered to be the most important distribution in statistics and, among other things is defined as having a total area under the curve of 1, is mounded and symmetrical and the Mean, Median and Mode are _____________.
Correct Answer: D
Question 12
Fractional Factorial Designs are used to analyze factors to model the output as a function of inputs if Hypothesis Testing in the Analyze Phase was inadequate to sufficiently narrow the factors that significantly impact the output(s).
Correct Answer: B
Question 13
Measurement __________ is defined as the difference between the observed and the expected values for a given set of data.
Correct Answer: C
Question 14
If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?
Correct Answer: C