Question 1
Significant variation in process performance is a consequence of several causes that can be classified using terminologies shown here. (Note: There are 2 correct answers).
Correct Answer: B,C
Question 2
Measurement error is defined as the effect of all sources of measurement variability that caused an observed or measured value to deviate from the __________.
Correct Answer: A
Question 3
To draw inferences about a sample population being studied by modeling patterns of data in a way that accounts for randomness and uncertainty in the observations is known as ____________________.
Correct Answer: B
Question 4
With the use of Statistics we define the population to be a large enough sample set of data such that you can analyze it and draw conclusions as to all of the data.
Correct Answer: A
Question 5
The proper functioning of a Visual Factory is dependent upon which of these?
Correct Answer: A
Question 6
Select all the statements that are true after reviewing the Capability Analysis shown here. (Note: There are 4 correct answers).
Correct Answer: A,C,D,E
Question 7
For the data shown here a Belt suspects the three grades are supplying the same results. Which statement(s) are true for proper Hypothesis Testing?
Correct Answer: A
Question 8
Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:
Correct Answer: B
Question 9
A 1-Sample t-test is used to compare an expected population Mean to a target.
Correct Answer: B
Question 10
A primary benefit of using a Multi-Vari Chart is it provides a visual presentation of two-way interactions.
Correct Answer: B
Question 11
The Empirical Rule is important because it provides an estimate of the probability of an event occurring depending on the Standard Deviation from the Mean.
Correct Answer: B
Question 12
The 5 Why Analysis is only useful if the possible independent variable can be broken down into five possible causes.
Correct Answer: A
Question 13
Bias in Sampling is an error due to lack of independence among random samples or due to systematic sampling procedures.
Correct Answer: B
Question 14
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
Correct Answer: B
Question 15
Which of these is Discrete data?
Correct Answer: A