Welcome to TestSimulate

Pass Your Next Certification Exam Fast!

Everything you need to prepare, learn & pass your certification exam easily.

365 days free updates. First attempt guaranteed success.

EXIN EPI Certified Data Centre Specialist (CDCS) Free Practice Test

Question 1
What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?

Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 2
The noise levels in the data center are approximately 91 dB (A).
Do employers need to take precautions?

Correct Answer: B
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 3
The temperature in the computer room is being increased from 18°C/64°F to 27°C/81°F.
What is the impact, if any, on the amount of gas required to suppress a fire assuming the gas is a Halocarbon?

Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 4
ICT rack consumes 3 kW with #T ~11 °C (20 °F). Calculate required airflow (CFM).

Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 5
What is the main disadvantage of using a ToR (Top of Rack) design?

Correct Answer: C
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 6
What is the first step in the design stage of the data center life cycle?

Correct Answer: B
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 7
Which formula is correct?

Correct Answer: C
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 8
Which of the following statements is correct?

Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 9
An MCB needs to be installed in the PDU of an ICT rack. Which breaking curve should you select?

Correct Answer: C
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 10
Which efficiency indicator accounts for all cooling costs (installation, operation, disposal)?

Correct Answer: B
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).