GAQM Certified Lean Six Sigma Black Belt (CLSSBB) (CLSSBB) Free Practice Test
Question 1
An x-bar control chart has been established with control limits of 3.245 and 3.257, n = 5. An engineer collects the following sample and plots the average on the control chart: 3.257, 3,256, 3. 258, 3.259.
Correct Answer: A
Question 2
The Graph which helps to identify and prioritize problems to be solved?
Correct Answer: A
Question 3
SWOT is an acronym for:
Correct Answer: A
Question 4
Which of the following is not a Measure of Central Tendency?
Correct Answer: A
Question 5
Find Cp and Cpk.
Correct Answer: A
Question 6
The essence of Lean is to concentrate effort on removing variation from a process output while lowering cost. (True/False)
Correct Answer: B
Question 7
What percent of population falls below the lower specification limits?
Correct Answer: B
Question 8
A quality leader who did extensive work with Japanese industry is:
Correct Answer: G
Question 9
Which of the following is the best technique for improving the precision of a designed experiment when the experimental material is NOT homogeneous?
Correct Answer: C
Question 10
A set of data from a process has 8 readings per sample and 50 samples. The mean of the 50 sample means is 12.62. The mean of the 50 ranges is 0.18.A customer requires that SPC charts be done on their forms which have spaces for only 5 readings per sample. What should be the UCL and LCL for the new averages chart?
Correct Answer: B
Question 11
Successful Six Sigma projects always:
Correct Answer: A
Question 12
For an F-test to be inferentially valid, all of the following assumptions must be true EXCEPT the
Correct Answer: A
Question 13
Critical to Quality parameters are derived from?
Correct Answer: A
Question 14
An x-bar and R chart has four part measurements per sample. The control limits on the averages chart are 2.996 and 3.256. Assume the process data form a normal distribution. What is the probability that the next plotted point falls outside the control limits?
Correct Answer: D