IBM Assessment: IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design (A2180-606) Free Practice Test
Question 1
A company specializing in holiday packages needs to finalize the resource planning for the summer period. Which attribute should a process analyst define to fulfill this requirement if the process availability is set for a period of 12 months starting in January?
Correct Answer: D
Question 2
A process analyst has performed simu-lation upon a business process and is analyzing resource allocation within the process. The average elapsed duration for the process is 2 hours, 57 minutes. After running the Process Resource Dynamic Analysis Report, it is observed that the Field Tech Resource has an average Quantity Allocated value of .6 units. The Process Resource Allocation Dynamic Analysis Report is also generated against the simu-lation results, and it is determined that there is an Average Shortage Duration of 37 minutes, 30 seconds for the resource. The process analyst also observes that the Field Tech Resource has been defined to the process as a bulk resource with an availability value of 3. Based on this information, what conclusions can the process analyst draw?
Correct Answer: B
Question 3
A process analyst needs to model and simulate the following scenario in a business process: In a call center the manager of the department starts to take calls after all the operators are on the phone. How should the scenario be modeled to represent this behavior?
Correct Answer: A
Question 4
A process analyst needs to determine the percentage of sales and marketing function related tasks in the current process. Which is the MOST appropriate way to identify these tasks?
Correct Answer: A
Question 5
A process analyst needs to analyze each instance of the application approval process to determine which applications are from a specific location. Which is the MOST effective way to analyze this information?
Correct Answer: D
Question 6
A process analyst needs to simulate a printing process in a print shop. In a typical day, the printing machine will start running at 8 o'clock in the morning, and take approximately 2 hours to warm up. Then it will start running efficiently for the rest of the day. The printing machine will run for 7 hours and stop at 5 o'clock in the afternoon. Which of the following settings should be used to simulate this scenario for a typical day?
Correct Answer: C
Question 7
A business analyst needs to validate external process touch points using Business Designer. Which of the following will be useful in the validation?
Correct Answer: A,D
Question 8
A task has three different individual resource requirements. Each resource has a different length of time required. When simulating with the option to use resources' time required as a task processing time, what is the time required for the task to complete?
Correct Answer: A
Question 9
As part of the modeling for implementation requirements, aggregate metrics defined in the Business Measures view are required to be visible in Business Space. How should a process analyst model an aggregated metric that is based on a user defined function?
Correct Answer: B