A retail customer has primary data centers, distribution centers, and retail stores. The retail locations are smaller sites that have less than 2 TB of data that need to be highly available. Each location is consolidating between six and twelve physical servers into a virtual cluster running on two HP ProLiant DL380 Gen8 servers.
The customer needs a low-cost storage solution that they can use at each retail location and can scale using similar technology for the distribution centers. The solution also needs to integrate with VMware and provide future replication with no additional cost.
Which HP Storage solution should you recommend?

Correct Answer: D
Question 2
2 DataCenters, FC network was grown -> more than 200 ports per Fabric, FC Switches 8-40 ports, Each in dual redundant layout.
The Goals are:
A) Customer should consolidate to latest technology
B) FC Connection between DC needs to be encrypted, scale beyond 300 ports, with least Management

Correct Answer: B
Question 3
An existing environment contains a two-node HP 3PAR StoreServ 10400 storage array with approximately 60 TB of capacity spread across three tiers. The customer plans to replicate their business critical data to a remote DR site. The customer cannot afford to lose any of this data. You propose that the customer install an HP 3PAR StoreServ 7400 Storage system at the DR site.
The CFO does not want the remote equipment to sit idle, so the customer will use that equipment for data mining. The results must be replicated back to the main site. The customer also requires that the replication of the data mining results have zero impact on the data mining performance.
Which HP 3PAR technology enables the proposed solution to meet the customer requirements?

Correct Answer: A
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 4
Refer to the exhibit: You are presenting a converged infrastructure proposal to the director of IT and the infrastructure administration team. The configuration is to refresh the infrastructure at a wholly-owned subsidiary company.

They plan to have a SQL standby server in their main data center for recovery. The director informs you that the subsidiary IT staff has been laid off and that the configuration needs to be as easy to manage as possible because it will be done remotely.
What should you do to improve the proposal TCO?

Correct Answer: D
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 5
A large publicity-traded motion picture exhibitor that is a leader In digital and 3D cinema deployments operates 233 theaters and more than 2,200 screens in small to mid-sized communities in 35 states around United States. They rely on MS Exchange Server 2010 for email, MS SQL. Server 2010 for analyzing data about movies and theater-goers, and MS Excel 2010 for crunching numbers.
The company runs nightly incremental backups and a full weekly backup that consists of close to 7TB of data which takes up 72 hours to complete. The quarterly backups add an additional 7 TB of data. Tapes are inventoried and transported from the main data center to the disaster recovery site 150 miles away. The process of transporting tape cartridges to and from the Disaster Recovery site requires hours of daily work.
The company currently relies on an aging robotic tape library and a process that takes the nightly backup tapes of site every morning. Additionally, the company keeps an inventory, and if a restore is necessary, they have to retrieve the tapes from the DR site and transport them to the main data center site. They have a 7 year data retention plan, and the tapes are expensive and not always reliable. Given the company's current system, if a full weekly backup fails over a weekend, the rerun could take p to 10 hours, even if just one job failed.
The company has deployed an virtualized server infrastructure which runs VmWare VSphere 5 on HP BladeSystem c7000 enclosures and BL460c servers interconnected with HP virtual Connect Flex-10 10Gb Ethernet modules as well as several HP ProLiant DL380 servers.
The company top four IT improvements goal are as follows:
-replacing the aging robotic tape library
-enabling replication of backed up data from the main data center to the disaster recovery site (150 miles)
-retaining more backup data in smaller disk space
-increasing efficiency, reliability and ease of System administration.
Moreover the company's top thee business benefit goals are as follows:
-increased confidence in disaster recovery
-Minimal disruption by backup during regular business hours
-improved management of external audits.
Refer to the scenario. Which additional information do you require to validate the customer DR strategy? (Select three.)

Correct Answer: A,C,F
Question 6
You need to ensure data integrity on physical disks within the proposed HP 3PAR StoreServ Storage array.
Which HP 3PAR StoreServ Storage component calculates the value of the disk T10 Data Integrity Feature (DIF)?

Correct Answer: B
Explanation: Only visible for TestSimulate members. You can sign-up / login (it's free).
Question 7
The customer has two HP 3PAR StoreServ 7000 Storage systems split between two data centers. Used capacity of each storage system is 10 TB of data. The replication between data centers is performed via Ethernet/IP, and the replication technology used will be asynchronous. The maximum RPO is 30 minutes, and the daily change rate of the customer data is a maximum of 0.5%, which is created evenly throughout the day.
What is the required minimum bandwidth between the data centers for replication?

Correct Answer: B